Planning a build - Home Brew Forums
Register Now For Free!

Home Brew Forums > Home Brewing Beer > Electric Brewing > Planning a build

Reply
 
Thread Tools
Old 02-23-2013, 11:59 PM   #1
mrshaund
Recipes 
 
Jul 2012
marine city, mi
Posts: 198
Liked 3 Times on 3 Posts



So after searching my basement I found this outlet, just wanted to make sure before i plan that this is what i need picture is attached
Click image for larger version

Name:	2013-02-23_18-25-25_878.jpg
Views:	172
Size:	49.1 KB
ID:	103385  

 
Reply With Quote
Old 02-24-2013, 01:20 AM   #2
jeffmeh
HBT_SUPPORTER.png
 
jeffmeh's Avatar
Recipes 
 
Feb 2009
Posts: 2,160
Liked 211 Times on 181 Posts


That looks like a NEMA 10-50 receptacle, which I would expect to have two hots and a neutral at 240v. If that is the case, you don't have a true ground, and ideally should figure out how to get one. You can run a new line with H-H-N-G from the main panel, run a separate ground from the main panel, or use the controversial 3 in - 4 out spa panel.

Before you do anything, you should verify that you have 6awg wiring for the 50a circuit, that it really is H-H-N, and that it is on a 50a breaker on your main panel.

 
Reply With Quote
Old 02-24-2013, 01:33 AM   #3
mrshaund
Recipes 
 
Jul 2012
marine city, mi
Posts: 198
Liked 3 Times on 3 Posts


Yeah i just checked my box (sorry we just got the place) and I am gonna to assume its actually a 30a I could be wrong, I just want to know what i am working with for a starting point. I attached a pic
Click image for larger version

Name:	2013-02-23_20-28-55_532.jpg
Views:	154
Size:	31.8 KB
ID:	103426  

 
Reply With Quote
Old 03-08-2014, 08:34 PM   #4
rnm410
Recipes 
 
Feb 2014
Baton Rouge, Louisiana
Posts: 253
Liked 16 Times on 16 Posts


I am in the same situation, I have a NEMA 10-50 on a 50A breaker.
Is it possible to use another ground on a different circuit wiring it all in together?

 
Reply With Quote
Reply
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Electric Build Planning Ezekielsays Electric Brewing 6 02-24-2013 10:52 AM
Planning My e-BIAB Build Brewbien Electric Brewing 0 02-12-2013 05:41 PM
Planning an E-HERMS build - questions scottsr123 Brew Stands 13 12-02-2012 10:53 PM
HERMS Build Planning: DIN Rails or not? Rarian Electric Brewing 25 11-18-2012 11:59 PM
Control Panel PLANNING and BUILD smoothlarryhughes Electric Brewing 24 10-14-2012 04:33 PM


Forum Jump