Home Brew Forums > Home Brewing Beer > DIY Projects > Brew Stands > Recycle bin pump build
Reply
 
Thread Tools
Old 10-18-2012, 06:52 PM   #1
blacksquid
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jul 2012
Location: Montreal, quebec
Posts: 76
Likes Given: 6

Default Recycle bin pump build

**EDIT: OOPS. Sorry this should be in DIY Projects! Could a mod please move this?**

95% done, I cut some thick plastic to go over it and need to get some more machine screws and wing nuts to keep it in place. Then, drill some holes in the plastic for the mounting screws on my B3-23A-30 plates duda chiller to go through.

The original idea was to mount it the other way around (bottom up), but I scrapped the idea of using the holes to install a handle, when I already have two of them already on it. Seeing as the PC would sit on it, the balance was also a bit weird. The PC sits perfectly on the sides of the bin.

I may cut the plastic to add a hinge but I don't plan on having to look at the wiring all that often. I'll post pictures when I'm done with this - the fittings from Duda should be here anytime now.


Click image for larger version

Name:	march809.jpg
Views:	178
Size:	35.6 KB
ID:	80024   Click image for larger version

Name:	march8093.jpg
Views:	161
Size:	30.0 KB
ID:	80028   Click image for larger version

Name:	march8094.jpg
Views:	160
Size:	27.5 KB
ID:	80030  
blacksquid is offline
 
Reply With Quote
Reply


Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
My Toolbox pump build crypt0 Brew Stands 2 04-14-2012 07:22 PM
$20 pump whirlpooler build Adeering Chillers and Stir Plates 6 02-20-2012 04:38 PM
Pump build cfrazier77 Brew Stands 5 09-23-2011 04:59 AM
Yet another portable-pump build. Schnitzengiggle Brew Stands 5 05-18-2011 05:11 AM
My Pump in a Toolbox build. thesanch Brew Stands 7 10-08-2010 11:47 PM


Forum Jump

Newest Threads

LATEST SPONSOR DEALS