I'm starting to collect the parts for my eBIAB system and had a couple of questions. Here are the specs:

240V, 30A via a spa panel connected to a dryer outlet
-1 PID/SSR, 1 5500W element
-4 switches:
- mushroom button - main power (using a contactor, not resistors)
- Alarm
- Element power - via contactor
- pump
-120v case fan - although i'm using an external heatsink, I'm going to include the pump motor in the control enclosure (toolbox).
-120v accessory outlet
-chugger center inlet pump (head mounted outside toolbox)

The element and pump switches are illuminated. I'm adding an LED between the PID and SSR to show when element is hot. Another LED for main power.

All of the major components have been ordered. Now I'm just trying to figure out what I need for wiring, terminal blocks, fuses, ring terminals, etc. Can anyone shed some light on how much wire I should buy? I plan to use 10 AWG for anything in the element power circuit, but the pump circuit, LEDs and controls can all be 14 AWG, right?

My other concern is a backpanel for inside the toolbox. Is using a piece of sheet metal the easiest option? Thoughts on gauge?

Finally - I bought the 19" Homak hip-roof toolbox for an enclosure. Pump motor will be through the right wall, looking down from the top. Is that going to leave me enough room for all these other components, or am wishfully thinking?

 
Reply With Quote
Old 12-09-2012, 03:51 AM   #2
grunewaldj
Recipes 
 
Jul 2010
, East Wisconsin
Posts: 12


Any updates on your project?

 
Reply With Quote
Old 12-09-2012, 08:08 PM   #3
tjash
Recipes 
 
Jan 2012
Cumberland, ME
Posts: 63
Liked 7 Times on 4 Posts


Not too much to report. Been a busy fall! I decided to leave the pump outside the box. Either mount it in another box for portability, or mount it to the BIAB stand I'm also planning. All the components are bought, and I figured out what to do for a back panel. I'm using a sheet of 16 gauge sheet metal from HD, with 1/2" bolts through it to raise it off the bottom. Most holes are drilled for mounting the internal components. Next step is to cut the holes for the controls, then start wiring.

 
Reply With Quote
Old 12-09-2012, 11:25 PM   #4
grunewaldj
Recipes 
 
Jul 2010
, East Wisconsin
Posts: 12


Sounds like it's coming along great. I just started working on converting my propane BIAB system to all electric. I also was going to have the pump inside my panel but changed it to mount on the stand as well. I'd love to see some pictures as time permits.

 
Reply With Quote
Old 02-14-2013, 05:59 PM   #5
tjash
Recipes 
 
Jan 2012
Cumberland, ME
Posts: 63
Liked 7 Times on 4 Posts


Just testing my ability to post an image





 
Reply With Quote
Old 02-14-2013, 06:25 PM   #6
tjash
Recipes 
 
Jan 2012
Cumberland, ME
Posts: 63
Liked 7 Times on 4 Posts


Finally found some time to work on the controller. Here are some shots of the progress so far. The test pic above shows the front of the toolbox under construction. I also have two contactors and terminal block mounted to the back panel. Just ordered a ratcheting crimper and hope to start wiring in the next few days.


You can see here where my pilot bit snapped and the hole saw skipped across the side of the toolbox. Nothing some nail polish can't fix!


Beginning to test fit the controls


Here's the hole for the SSR to attach to the heat sink.


Supply side


Controls all fit! (not without a couple of rounds of tweaking with the Dremel)


Load side, plus thermocouple quick disconnect. Can also see the heat sink on the back in this shot.


Internals, minus the SSR and back panel, which holds the contactors, terminal block, and fuses.


Thanks for taking a look! I will post more pics as I start wiring. Let me know if you have any questions or want to see anything specific.

 
Reply With Quote
Old 02-14-2013, 07:08 PM   #7
tjash
Recipes 
 
Jan 2012
Cumberland, ME
Posts: 63
Liked 7 Times on 4 Posts


Here's a shot of the front with some labels:


Reason: larger image attached

 
Reply With Quote
Old 02-14-2013, 07:11 PM   #8
CDGoin
 
CDGoin's Avatar
Recipes 
 
Dec 2012
Midlothian, Virginia
Posts: 682
Liked 81 Times on 60 Posts


This is really neat, real professional look to it.
__________________
BEER - Some call it a problem, I call it a Hobby
  1. In the primary : MarZZzzen
  2. In the secondary : #$^%^*%$#

 
Reply With Quote
Old 02-14-2013, 07:17 PM   #9
jeffmeh
HBT_SUPPORTER.png
 
jeffmeh's Avatar
Recipes 
 
Feb 2009
Posts: 2,143
Liked 210 Times on 180 Posts


Looks great.

You may want to wire your "element on" indicator in parallel with the wiring to the element (assuming it's a 240v led). That's a more certain indicator as to whether there is power going to the element.

tjash Likes This 
Reply With Quote
Old 02-14-2013, 08:29 PM   #10
tjash
Recipes 
 
Jan 2012
Cumberland, ME
Posts: 63
Liked 7 Times on 4 Posts


Quote:
Originally Posted by CDGoin View Post
This is really neat, real professional look to it.
Thanks! I really appreciate that, considering this is my first time doing any kind of metal work.


Quote:
Originally Posted by jeffmeh View Post
Looks great.

You may want to wire your "element on" indicator in parallel with the wiring to the element (assuming it's a 240v led). That's a more certain indicator as to whether there is power going to the element.
Thanks as well! Great idea, and part of my plan. The element switch (red push button) is illuminated and will indicate power is AVAILABLE to the circuit. The yellow LED will only light up when the PID is sending a signal to energize the element.

Reason: spelling

 
Reply With Quote
Reply
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Help/suggestions for a 110v eBIAB/Smoker combo controller tjash Electric Brewing 2 12-03-2012 05:34 PM
LG 3-MD-HC pump questions ernestmyname Electric Brewing 16 04-01-2012 04:06 AM
Apartment brewing: eBIAB + all-in-a-toolbox system Gabrew Electric Brewing 48 02-26-2012 05:11 PM
eBIAB using Ranco controller el gato Electric Brewing 11 11-19-2011 04:11 AM
Johnson Control's: Digital Temperature Controller (heating) Questions... Conway Electric Brewing 3 02-10-2011 05:47 PM


Forum Jump