Spike Brewing Giveaway - New v3 Kettle

Home Brew Forums > Home Brewing Beer > Electric Brewing > Hidden Creek E-brewery build
Reply
 
Thread Tools
Old 09-17-2012, 12:50 AM   #21
TrainSafe
Feedback Score: 0 reviews
Recipes 
 
Join Date: Mar 2011
Location: Appleton, WI
Posts: 795
Liked 67 Times on 46 Posts
Likes Given: 7

Default

Quote:
Originally Posted by dburgette

The sticker on the back is upside down on the meter. Just keep the connections the same and flip it around....problem solved.
Thanks. I considered that option, but I guess I blew it off because I thought the text would face the same direction and the connections would be oriented the same. My conductors are going to be too short, so I'll need to rewire them if I flip it. I shared a multi conductor cable for the power supplies on both meters, so I'd need to redo both.


TrainSafe is offline
 
Reply With Quote
Old 09-22-2012, 03:56 PM   #22
TrainSafe
Feedback Score: 0 reviews
Recipes 
 
Join Date: Mar 2011
Location: Appleton, WI
Posts: 795
Liked 67 Times on 46 Posts
Likes Given: 7

Default

I got a bunch done this week. I think my first batch will be brewed in the next week or do.

The boil kettle is now done and leak tested.

Control panel is done except for the tags.

I just need to pick up a couple more fittings for the hoses and mount the pumps and that should be it.

I'll post more pics when I'm home again.
TrainSafe is offline
 
Reply With Quote
Reply

Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
My Electric Brewery Build! jbsengineer Electric Brewing 186 01-26-2016 12:51 AM
Electric brewery build nostalgia Electric Brewing 200 12-29-2015 02:22 AM
Kevin's E-Brewery Build KevinWagner Electric Brewing 43 08-29-2012 04:16 AM
Another E-Brewery Build BigJim_inFLA Electric Brewing 47 08-05-2012 10:57 PM
Yet Another E-Brewery Build.. HopheadNJ Electric Brewing 5 03-01-2012 02:51 PM


Forum Jump