Ss Brewtech’s Biggest Baddest Holiday Giveaway Ever!

Home Brew Forums > Home Brewing Beer > Fermentation & Yeast > Pushing time frame for competition.
Thread Tools
Old 07-21-2012, 02:16 AM   #1
Feedback Score: 0 reviews
Join Date: Dec 2009
Location: Rochester, MN
Posts: 104
Liked 1 Times on 1 Posts

Default Pushing time frame for competition.

Alright, I need some input. I am unexpectedly able to brew my no longer black ipa this evening. This is also the beer I have been bummed about not being able to get into the State Fair as it has been judged the past 2 years. Knowing that state fair drop off is no later than Aug. 4th The problem comes in when I learned today that next tues - fri and all the following week I will be in Eau Claire for training for the new job. I could push the brewing timeline really tight as follows:

Brew tonight, est OG 1.077. Pitch notty (no starter but I can bloom it in warm water) in temp controlled fridge at 68 degrees.
Add 2.5 oz dry hop on Monday evening before I leave town.
Bottle Sunday the 29th.
Deliver to Northern Saturday the 4th.
This is grain to bottle in 10 days..........eek. But would have 3 weeks carb time.

I could brew tonight.
Dry hop Saturday the 28th.
Bottle Friday the 3rd.
Deliver Saturday the 4th.
This puts me at only 2 weeks bottled before judging AND there is always that slim chance of bottle bombs while sitting in storage at northern etc...


Originally Posted by 98EXL
"You are no longer a n00b when:
You buy your smack pack at lunch, as well as some DME for starters. Get back in your car, smack it likes it's SWMBO's ass"
Originally Posted by Kadmium View Post
"SHIMMY!!!!" (aussie for f***kin awesome)
Originally Posted by TexLaw View Post
You know you're a homebrewer when you tell what hops are in a fart.
PHBalanced is offline
Reply With Quote

Thread Tools

Similar Threads
Thread Thread Starter Forum Replies Last Post
RIS Conditioning Time-Frame tolkheleknar Fermentation & Yeast 2 11-27-2011 05:15 AM
DFH local brewing competition Native302 Fermentation & Yeast 29 05-22-2011 10:02 PM
Every time I pitch I give myself something to worry about. This time 17 hour lag jetmac Fermentation & Yeast 8 05-20-2011 12:11 AM
bottle harvesting yeast time frame kgfitz Fermentation & Yeast 8 05-08-2011 05:42 PM
Yeast starter time frame LCTitan Fermentation & Yeast 1 11-23-2010 06:50 PM

Forum Jump

Newest Threads