110v Recirculating eBIAB 2.5 gallon batches - Page 18 - Home Brew Forums
Register Now For Free!

Home Brew Forums > Home Brewing Beer > Electric Brewing > 110v Recirculating eBIAB 2.5 gallon batches

Reply
 
Thread Tools
Old 12-06-2012, 04:47 AM   #171
captain_brew
Recipes 
 
Nov 2012
Posts: 34
Liked 1 Times on 1 Posts


Yeah, I still want to mount the pump and therminator. and add some hooks on the sides of the stand to hold things like mash paddle, hose, etc etc. Everything else so far fits in the tool box. My new blichmann gloves, a hop spider I built for like $10, back flow hose for chiller, yeast nutrient/whirfloc (yeast when I travel with it) etc etc etc. PBW and Star-San.

 
Reply With Quote
Old 12-06-2012, 02:39 PM   #172
cheesecake
 
cheesecake's Avatar
Recipes 
 
Oct 2009
Palatine il
Posts: 1,083
Liked 52 Times on 44 Posts


Where did you get the stand. Im looking for something like that on wheels

 
Reply With Quote
Old 12-06-2012, 05:10 PM   #173
captain_brew
Recipes 
 
Nov 2012
Posts: 34
Liked 1 Times on 1 Posts


Quote:
Originally Posted by cheesecake View Post
Where did you get the stand. Im looking for something like that on wheels
I got the stand at home depot for $19.95. The posts have threads with feet that i'm sure you could modify for wheels.

 
Reply With Quote
Old 12-07-2012, 12:16 PM   #174
BrothOfVigor
Recipes 
 
May 2011
Idaho Falls, ID
Posts: 81
Liked 14 Times on 9 Posts


Quote:
Originally Posted by captain_brew

I got the stand at home depot for $19.95. The posts have threads with feet that i'm sure you could modify for wheels.
I have the same stand and have looked long and hard to find threaded casters that fit. No luck so far. The female threads are pretty dinky.

 
Reply With Quote
Old 12-07-2012, 10:16 PM   #175
inhousebrew
Recipes 
 
Aug 2012
minneapolis, minnesota
Posts: 1,465
Liked 127 Times on 114 Posts


I have a question regarding the placement of the RTD sensor for you all:

I'm thinking about doing this and since I'm doing it inside already it will most likely be in the kitchen sitting on the stovetop which leads me to thinking that I could supplement the heat from the element with the burner to reach mash temp and boil. With that in mind, would the heat coming out from underneath the kettle potentially harm the cord plugged into the probe. It looks like you placed yours pretty low from the pictures, somewhere near the same height as the ballvalve.
__________________
I hate Walder Frey...

 
Reply With Quote
Old 12-07-2012, 10:19 PM   #176
jammin
HBT_LIFETIMESUPPORTER.png
 
jammin's Avatar
Recipes 
 
Jun 2011
Meridian, ID
Posts: 2,139
Liked 409 Times on 305 Posts


^just stick the probe near the element base - that way all the cords go to 1 place.

I have a glass stove top and have no issues with heat to cord

 
Reply With Quote
Old 12-08-2012, 12:58 AM   #177
BoxBrewer
Recipes 
 
Feb 2012
Golden, CO
Posts: 156
Liked 3 Times on 3 Posts


Started my own thread so I wasn't just posting pictures in here. Feel free to come see my progress, and thanks for everybody contributing to this thread!

 
Reply With Quote
Old 12-10-2012, 03:43 PM   #178
rex
Recipes 
 
Mar 2008
Newfoundland
Posts: 86
Liked 1 Times on 1 Posts


I want to do something like this:

http://www.pjmuth.org/beerstuff/imag...simple-1-s.jpg

I also want to add an E stop and a main on/off keyed switch.

Can anyone help with the diagram?
__________________
www.getfirefox.com

 
Reply With Quote
Old 12-10-2012, 04:00 PM   #179
inhousebrew
Recipes 
 
Aug 2012
minneapolis, minnesota
Posts: 1,465
Liked 127 Times on 114 Posts


Well, I feel a little dirty because I just asked for a lot of really specific electronic equipment for X-mas. We drew names and my gf's sister and mom got me and wanted to know what I wanted. I basically copy and pasted the list from page one or two of this page and said I want some of these things.
__________________
I hate Walder Frey...

2
People Like This 
Reply With Quote
Old 12-10-2012, 07:05 PM   #180
cheesecake
 
cheesecake's Avatar
Recipes 
 
Oct 2009
Palatine il
Posts: 1,083
Liked 52 Times on 44 Posts


My pot is assembled. Just waiting to order the other parts on friday

 
Reply With Quote
Reply
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
How to build a 5 gal, 110v eBIAB kettle Disintegr8or Electric Brewing 102 05-23-2016 12:48 AM
110v Hlt kickrjason Electric Brewing 24 07-08-2012 04:05 AM
110v to 3v??? BigPatBrewer Electric Brewing 18 05-07-2012 06:04 PM
Anybody brew 10g batches with a 2250w 110v ? joeybeer Electric Brewing 3 01-25-2012 12:40 AM
1 PID for 2 110v elements mr_tripp Electric Brewing 6 05-06-2011 03:08 AM


Forum Jump