Building new stand, changing plan from propane to electric and need help - Home Brew Forums
Home Brew Forums > Home Brewing Beer > Electric Brewing > Building new stand, changing plan from propane to electric and need help

Reply
 
Thread Tools
Old 01-14-2012, 01:10 PM   #1
vaheel
Recipes 
 
Mar 2011
Wise, VA
Posts: 82


So, I am ready to begin on a new brew stand next week. I brew 5 gallon and want to move up to 10 gallon batches. The original plan was to base the design on SouthernYankee's single tier propane, however a few days ago I started thinking that I woule really like to have the ability to brew indoors and started reading about electric set-ups and would like to go this route if at all possible with a reasonable expense. I have an open 30A breaker that I can run wiring to a GE Spa box in my basement. I have read a lot on the electric brewery and its awesome, just out of my price range.

Goal:
Begin with a basic electric system that I can expand to a three vessel system without having to re-buy or replace parts as I expand.

Here's what I have now:
Two keggles for HLT and BK
Coleman Xtreme for MLT (eventually plan on replacing with another keggle)
1 1/2" steel for brew stand

Here's what I am thinking I need for electric:
Convert HLT to ekeggle (weldless element using POL's design) 5500W
Convert BK to ekeggle (weldless) 4500W
pump(s)
GE Spa Panel for GFCI
30A outlet (3 wire or 4 wire, not sure)
Temp module?
Control panel-this is where I need the most help and basically clueless. Can anyone suggest parts needed? I know I am asking alot, just need some help and direction.

Thanks!



 
Reply With Quote
Old 01-14-2012, 02:09 PM   #2
wadefisher
Brew Meister
HBT_LIFETIMESUPPORTER.png
 
wadefisher's Avatar
Recipes 
 
Jul 2009
Lewistown / Dade City, PA / FL
Posts: 278
Liked 10 Times on 8 Posts


Quote:
Originally Posted by vaheel View Post


Here's what I am not thinking I need for electric:
???? "not" ??

Quote:
Originally Posted by vaheel View Post
Convert HLT to ekeggle (weldless element using POL's design) 5500W
Convert BK to ekeggle (weldless) 4500W
pump(s)
if $$$ is holding you up consider using multi-tier. uses less pumps. I find it simpler. Just my opinion.
Quote:
Originally Posted by vaheel View Post
GE Spa Panel for GFCI
30A outlet (3 wire or 4 wire, not sure)
Try to make it 4 wire. If you are running a new circuit then 4 for sure.
Quote:
Originally Posted by vaheel View Post
Temp module?
Control panel-this is where I need the most help and basically clueless. Can anyone suggest parts needed? I know I am asking alot, just need some help and direction.
Search this forum and read alot this can help you more than anyone telling you what you want, need or can afford.
You can go very simple, which is usually less $$, or go with all the bells and buzzers you want.
Find your happy median.


__________________

www DrunkMonkeyBrewWerks dot com

Reason: more detail

 
Reply With Quote
Old 01-14-2012, 03:10 PM   #3
vaheel
Recipes 
 
Mar 2011
Wise, VA
Posts: 82

Thanks for the reply!

The "not" was a typo on my part. I am reading and learning more as I go. I really can't see reason not low go electric.

 
Reply With Quote
Old 01-15-2012, 01:27 AM   #4
vaheel
Recipes 
 
Mar 2011
Wise, VA
Posts: 82

Do I need two PID's for the BK and HLT ekeggle or just one?

 
Reply With Quote
Old 01-15-2012, 01:41 AM   #5
P-J
HBT_LIFETIMESUPPORTER.png
Recipes 
 
Mar 2010
Charlotte, NC
Posts: 3,337
Liked 301 Times on 235 Posts


Quote:
Originally Posted by vaheel View Post
Do I need two PID's for the BK and HLT ekeggle or just one?
You are running on a 30A circuit. You only need to have one PID. Switching allows you to maintain control of you system and its process.

 
Reply With Quote
Old 01-18-2012, 12:23 AM   #6
vaheel
Recipes 
 
Mar 2011
Wise, VA
Posts: 82

Quote:
Originally Posted by P-J View Post
You are running on a 30A circuit. You only need to have one PID. Switching allows you to maintain control of you system and its process.
Thanks for the reply P-J!

So with one PID I would need to switch between the elements. If I used two PID's could I run both elements at the same time? Would this need a larger circuit?

 
Reply With Quote
Old 01-18-2012, 12:43 AM   #7
P-J
HBT_LIFETIMESUPPORTER.png
Recipes 
 
Mar 2010
Charlotte, NC
Posts: 3,337
Liked 301 Times on 235 Posts


Quote:
Originally Posted by vaheel View Post
Thanks for the reply P-J!

So with one PID I would need to switch between the elements. If I used two PID's could I run both elements at the same time? Would this need a larger circuit?
With a 30A-240V circuit, you will only be able to run a single kettle at one time (HLT or BOIL). If you provide a 50A-240V circuit, you can run 2 kettles at the same time (HLT and BOIL). This would require that you to have 2 PIDs. With that setup you can do back to back batches. If you do not intend or want to do back to back brew sessions, save your money and just use a single PID.

Hope this makes sense and helps you.

 
Reply With Quote
Old 01-18-2012, 01:19 AM   #8
vaheel
Recipes 
 
Mar 2011
Wise, VA
Posts: 82

Thanks again P-J! This helps me out alot. Have you designed a wiring diagram for this type off set-up before?

 
Reply With Quote
Old 01-18-2012, 01:30 AM   #9
Brickout
Recipes 
 
Feb 2010
Lockport, IL
Posts: 268
Liked 31 Times on 11 Posts


Check out PJ's diagram here. It's about as simple and inexpensive as you can get. It's pretty much what I'm modeling my system off of.

 
Reply With Quote
Old 01-18-2012, 01:32 AM   #10
vaheel
Recipes 
 
Mar 2011
Wise, VA
Posts: 82

Quote:
Originally Posted by Brickout View Post
Check out PJ's diagram here. It's about as simple and inexpensive as you can get. It's pretty much what I'm modeling my system off of.
Thanks Brickout! How faar along are you in your build?



 
Reply With Quote
Reply
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
e-Brewery Control Panel Project/Conversion from Propane to Electric stlbeer Electric Brewing 73 07-17-2014 01:47 AM
pricing going all electric, has anyone used a dunnage rack as a stand? boswell Electric Brewing 3 09-30-2011 09:48 PM
Help me plan an eBIAB build Namocsid Electric Brewing 3 09-23-2011 07:17 PM
Electric VS Nat Gas (not propane) JimWard Electric Brewing 20 12-31-2010 06:20 PM
Help with converting from propane to electric ddknight Electric Brewing 24 12-26-2010 04:26 PM


Forum Jump