Coldbreak Brewing HERMS Giveaway!

HomeBrewSupply AMCYL Brew Kettle Giveaway!


Home Brew Forums > Home Brewing Beer > DIY Projects > Fermenters > My Fermentation Chamber Build
Reply
 
Thread Tools
Old 08-30-2011, 03:10 AM   #1
dprbrts42
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2011
Location: Atlanta, GA
Posts: 34
Default My Fermentation Chamber Build

I am just starting out with Homebrewing and needed a space to properly control the temperatures for fermentation. I cannot store any of my equipment in the house so the garage is the only option. My garage reached 100+ temps this week alone...

I studied the builds on the site quite a lot and as usual I started really complicated, casters, a monster sized chamber, etc... Then after calculating the space available and internal measurements, I made it more realistic and came up with the following.

I have two layers of insulation, the first layer is 1/2" foam board which leaves a 1/2" airspace gap and then I have a second layer of 3/4" foam board.

For the door I wanted to install some of the "whiteboard" material for a dry erase surface. This would allow me to track which beers were fermenting with dates and information as needed.

I installed this same whiteboard material, which I found in my local HD, on the inside of the fermentor so that I could seal it and clean up would be easy. It is essentially a dense fiber board with a white paint on one side, nearly an enameled on finish.

At this point I am still needing to setup a temp control. I have fan control using an Arduino and some relays but decided to that I would bite the bullet and get a Love controller. I ordered the TSS2-2100 and a temperature probe. I would still like to get my Arduino working but I was nervous about the relay type and specs for properly controlling the compressor. This is something I can work on later. I want to brew some beer!!

Apparently Picasa doesn't share so nice... I'll get some pics uploaded properly in a bit.



dprbrts42 is offline
 
Reply With Quote
Old 08-30-2011, 04:48 AM   #2
SeattleMatt
Feedback Score: 0 reviews
Recipes 
 
Join Date: May 2011
Location: bothell, washington
Posts: 55
Default

Great job. I too went a little complicated but not with the structure. I built my temp controller from scratch. I used 3 thermistors and a FEZ Panda with an ARM processor.

Someone recommended using a temperature sensor instead of thermistors for a smaller circuit. http://www.sparkfun.com/products/245

Just make sure you use an MOV (metal oxide varistor) across the output of your relay to prevent the inductive load of the compressor from arcing. The arcs pit the relay contacts and wear them out faster.

You'll also want to insulate your temp sensor from the air temp... I put my sensor against the carboy and duct tape a piece of folded paper towel to it. You want the beer to be at your setpoint and this will give your compressor a break. The internal air temp will fluctuate by 10 degrees or so but it takes a while for 5 gallons to change temp.


SeattleMatt is offline
 
Reply With Quote
Old 08-30-2011, 01:59 PM   #3
dprbrts42
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2011
Location: Atlanta, GA
Posts: 34
Default

Click image for larger version

Name:	Sizingtheframe.jpg
Views:	559
Size:	27.8 KB
ID:	32603

Click image for larger version

Name:	placingthefridge.jpg
Views:	561
Size:	33.9 KB
ID:	32604

Click image for larger version

Name:	FrameReadyForInsulation.jpg
Views:	558
Size:	78.1 KB
ID:	32605

Click image for larger version

Name:	BeforeInsulation.jpg
Views:	574
Size:	24.6 KB
ID:	32606

Click image for larger version

Name:	FirstLayerwithgap.jpg
Views:	590
Size:	24.5 KB
ID:	32607
dprbrts42 is offline
 
Reply With Quote
Old 08-30-2011, 02:01 PM   #4
dprbrts42
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2011
Location: Atlanta, GA
Posts: 34
Default

Click image for larger version

Name:	totalinsulation.jpg
Views:	591
Size:	18.6 KB
ID:	32608
All of the insulation attached and ready for the whiteboard.

Click image for larger version

Name:	Insulating the Door.jpg
Views:	593
Size:	70.3 KB
ID:	32609


Click image for larger version

Name:	CompletedBuild.jpg
Views:	592
Size:	27.3 KB
ID:	32610
Here you can see the final enclosed chamber. On the left side will be the control panel and on the right I will create a cabinet for storing my brewing gear.

Click image for larger version

Name:	FirstBeer.jpg
Views:	612
Size:	26.4 KB
ID:	32611
I guess technically my daughter made the first beer...

dprbrts42 is offline
 
Reply With Quote
Old 08-30-2011, 02:06 PM   #5
dprbrts42
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2011
Location: Atlanta, GA
Posts: 34
Default

Click image for larger version

Name:	DualFan.jpg
Views:	599
Size:	58.4 KB
ID:	32612
I setup dual fans to pull the coolest air from the fridge and create some airflow in the chamber.

Click image for larger version

Name:	InsideBeforeWhiteWalls.jpg
Views:	601
Size:	20.9 KB
ID:	32613
Here is a shot showing the size, I should be able to comfortably fit 3 bottles in here
dprbrts42 is offline
 
Reply With Quote
Old 09-11-2011, 09:54 PM   #6
dprbrts42
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2011
Location: Atlanta, GA
Posts: 34
Default

Update on build....

I've installed the Love Temperature controller, I purchased the TSS2 and have wired it into a old External CD-ROM case. (I knew I saved those things for a good reason).
Click image for larger version

Name:	rearview.jpg
Views:	447
Size:	36.3 KB
ID:	33350
Click image for larger version

Name:	aftercleanup.jpg
Views:	438
Size:	41.6 KB
ID:	33351

Thanks to several threads on this site, wiring and programming the controller was a snap. There are some extra wires in there which control the fans inside the chamber. I will be adding an Arduino for data collection and eventual http posting of images inside the chamber.
Click image for larger version

Name:	2011-09-11_17-16-44_565.jpg
Views:	434
Size:	38.1 KB
ID:	33352

I will eventually install a heating element so that I can heat the chamber when temps do drop during the winter. I should have several months of warmer temps left this year though.
dprbrts42 is offline
 
Reply With Quote
Old 09-11-2011, 10:00 PM   #7
dprbrts42
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2011
Location: Atlanta, GA
Posts: 34
Default

Here is the front of the device, next to the controller will be LEDs for fan status and other indicators as needed.
Click image for larger version

Name:	front.jpg
Views:	431
Size:	36.1 KB
ID:	33353
dprbrts42 is offline
 
Reply With Quote
Old 09-11-2011, 10:36 PM   #8
Diver165
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
Diver165's Avatar
Recipes 
 
Join Date: May 2010
Location: Huntington, WVA
Posts: 532
Liked 11 Times on 9 Posts
Likes Given: 3

Default

That's a nice build. Clean and makes good use of space.
Diver165 is offline
 
Reply With Quote
Old 09-12-2011, 12:05 AM   #9
Andynewbom
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jul 2011
Location: San Salvador, CA
Posts: 19
Default So stealing it!

Dude! great simple idea! thats the kind of nice DIY git er done we need to do to get things done here in El Salvador!

thanks for the inspiration!
__________________
Andy Newbom
Catador
Brew Revolution
Brewing a Craft Beer Revolution in Central America
Andynewbom is offline
 
Reply With Quote
Old 09-12-2011, 12:21 AM   #10
dprbrts42
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2011
Location: Atlanta, GA
Posts: 34
Default

Thank you guys.


dprbrts42 is offline
 
Reply With Quote
Reply


Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
My Fermentation Chamber Build Ace_Club Fermenters 101 08-06-2014 01:44 AM
Fermentation Chamber Build Seven Fermenters 1 07-28-2011 08:21 PM
My Fermentation Chamber Build jamesseth Fermenters 5 06-13-2011 05:19 AM
help with fermentation chamber build awarner Fermenters 7 05-11-2011 09:47 AM
Fermentation Chamber Build Eigenbrau Fermenters 37 02-17-2011 09:11 PM


Forum Jump

Newest Threads

LATEST SPONSOR DEALS