Building a House - Home Brew Forums

Register Now!
Home Brew Forums > Home Brewing Beer > DIY Projects > Brew Stands > Building a House

Reply
 
Thread Tools
Old 06-20-2011, 11:36 PM   #1
Craig311
Recipes 
 
Sep 2007
Posts: 347
Liked 6 Times on 3 Posts



So... Bought land and building a new house in the next year or so. Realistically, I'm still going to be brewing with my turkey fryer and cooler mash tun for the foreseeable future. However, this is going to be our "forever" house and I'd like to incorporate as many small things into the house as I can to help in future brewing.

The only thing I can think of is hot and cold water with a deep sink in the garage. Any other ideas? I'm just starting talks with the architect.

 
Reply With Quote
Old 06-20-2011, 11:40 PM   #2

1. Make that a double sink!
2. Outlets! Never know you might go electric and need 1 or 2 30A outlets...
__________________
Mead Lane Brewing
The liver is evil and must be punished

 
Reply With Quote
Old 06-20-2011, 11:58 PM   #3
Clann
Recipes 
 
Jun 2010
Edmonton Ky
Posts: 1,335
Liked 16 Times on 16 Posts


Congrats,
Beats the hell ouut of renting.
__________________
Back Nine Brew&Wine
Life don't get better than a beer and a pepper.
What I am brewing is now a mystery

 
Reply With Quote
Old 06-21-2011, 12:21 AM   #4
TheDom
 
TheDom's Avatar
Recipes 
 
Oct 2007
Fort Myers, FL
Posts: 382
Liked 4 Times on 4 Posts


A walk in cooler, or seperately air-conditioned room for fermentation/storage?

Easy hookups for an RO system next to that sink?

Natural gas hookups in the intended brewing area?

Ventilation in intended brewing area for pleasant comfortable indoor brewing year-round?

That's all I got for now. Congrats man!

 
Reply With Quote
Old 06-21-2011, 12:24 AM   #5
apparatus
HBT_LIFETIMESUPPORTER.png
 
apparatus's Avatar
Recipes 
 
Mar 2006
Salem, Oregon
Posts: 252
Liked 9 Times on 6 Posts


Put in a big floor drain with a grate over the top. Will be very useful.
__________________
Apparatus

 
Reply With Quote
Old 06-21-2011, 12:31 AM   #6
rosier9
Recipes 
 
Dec 2010
Bellevue, NE
Posts: 183
Liked 2 Times on 2 Posts


a brew room with hot/cold water and 50A service
__________________
Kegged: Amarillo Ale, Edwort's Apfelwein, Golden Dragon, 1554, 888 RIS
Primary:

 
Reply With Quote
Old 06-21-2011, 12:34 AM   #7
hillhousesawdustco
HBT_LIFETIMESUPPORTER.png
 
hillhousesawdustco's Avatar
Recipes 
 
Jan 2011
up near babb, mt
Posts: 646
Liked 35 Times on 34 Posts


I second getting your electrical all squared, and it would be pretty sweet to have a super-insulated "fermentation corner" somewhere. Also maybe design it to easily have beers on tap in your kitchen/den/wherever.

 
Reply With Quote
Old 06-21-2011, 12:37 AM   #8
Wakadaka
Recipes 
 
Mar 2011
Richmond, VA
Posts: 514
Liked 9 Times on 4 Posts


Yeah nice set up for taps in a kitchen/bar area would be optimal. Gas stove would be a good thing to consider for making starters or heating up sparge water, even if you are brewing outside.

 
Reply With Quote
Old 06-21-2011, 01:12 AM   #9
autobaun70
HBT_SUPPORTER.png
 
autobaun70's Avatar
Recipes 
 
Dec 2010
Spartanburg, SC
Posts: 667
Liked 97 Times on 65 Posts


I would personally do a 3 tier system with a staircase running up the back of it, basically a staircase to nowhere going up a wall. This way you could access the top of your HLT, mash tun, and kettle without messing with a pesky ladder or pumps. You could even make the same stair case be the access to a storage area over your garage.

 
Reply With Quote
Old 06-21-2011, 04:30 AM   #10
rollinred
Recipes 
 
Jan 2008
Traverse City, MI
Posts: 327
Liked 10 Times on 7 Posts


Put a small(ish) water heater in you brewing area. You don't have to leave it on but just have it there for hot cleaning water. You can turn it on to full temp setting and flip the breaker only when you are brewing or cleaning and such.

That would be my number 1 so that it is separate from the main water heater and not turned on most times.

After that is more electrical outlets in the brew area than you ever think you will need. 50A service is a must at one location at least (GFCI circuit of course).

Seriously do all of this stuff now as it gets so much more expensive to add after construction is done.

 
Reply With Quote
Reply
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Looking at building a Keezer.. KrayzieVanh Kegerators & Keezers 6 09-27-2010 04:21 AM
Building an HLT.. Hawgbranch Kettles, Mash Tuns & Hot Liquor Tanks 9 12-29-2009 03:13 AM
building my first MLT 400d Kettles, Mash Tuns & Hot Liquor Tanks 27 12-26-2009 04:01 PM
building a bar but really want a tower D-Boss Kegerators & Keezers 5 11-21-2008 03:44 PM
Building a Wet Bar Lepoc2635 Kegerators & Keezers 9 07-27-2007 10:03 PM


Forum Jump