Trunk line from Basement to 1st Floor - Home Brew Forums

Register Now!
Home Brew Forums > Home Brewing Beer > DIY Projects > Kegerators & Keezers > Trunk line from Basement to 1st Floor

Reply
 
Thread Tools
Old 05-10-2011, 01:55 PM   #1
HawkATP
Recipes 
 
Jan 2011
Posts: 125
Liked 2 Times on 2 Posts



I'm looking at building an insulated trunk line from my keezer to the first floor. The trunk line would carry 3 product lines and a recirculating coolant line. The run length would be about 9 feet out of the keezer (it is almost directly below where I want the taps on the next floor). I keep my keezer at about 38 degrees, and would keep the coolant and pump inside the keezer, not a seperate freezer. Anybody have any experience with keezer temperature coolant cooling the trunk lines? Hate to go through the effort and not have coolant lines that are cool enough to keep the product lines cool.

 
Reply With Quote
Old 05-10-2011, 04:19 PM   #2
_JP_
Recipes 
 
Mar 2011
Woodstock, GA
Posts: 315
Liked 13 Times on 8 Posts


A few ideas immediately came to mind:

Fill the "trunk line" will the coolant, instead of just having a coolant line.

Or, easier yet, insulate the trunk line (2-3" PVC?) and run a return pvc line back to the keezer, so that both ends of the PVC loop are inside the keezer. Put a supply and exhaust fan on the ends of the pipe and forget the water and pumps. If you did pick up some heat in the PVC run, you can always lower your keezer temp a few degrees to compensate.
__________________
Working on:
summer gardening

Upcoming projects:
NG line for outdoor burner

 
Reply With Quote
Old 05-10-2011, 04:22 PM   #3
weirdboy
HBT_LIFETIMESUPPORTER.png
Recipes 
 
May 2009
Los Angeles
Posts: 8,175
Liked 481 Times on 389 Posts


It is running straight up 9 feet...so like 10-12 feet total vertical?

 
Reply With Quote
Old 05-10-2011, 04:30 PM   #4
Chrisl77
Recipes 
 
Mar 2011
Jackson, New Jersey
Posts: 888
Liked 86 Times on 68 Posts


Could just get this to use as a trunk line.
http://www.kegman.net/products/4-Pro...252d-6846.html
I made somthing similar by pulling 1/4 inch polly lines through 1 inch pipe insulation. It was alot of work and only cost a little less then this stuff.

 
Reply With Quote
Old 05-10-2011, 05:30 PM   #5
HawkATP
Recipes 
 
Jan 2011
Posts: 125
Liked 2 Times on 2 Posts


Quote:
Originally Posted by weirdboy View Post
It is running straight up 9 feet...so like 10-12 feet total vertical?
The line will probably end up being 8' vertical with a 3' horizontal run.

 
Reply With Quote
Old 05-10-2011, 05:33 PM   #6
HawkATP
Recipes 
 
Jan 2011
Posts: 125
Liked 2 Times on 2 Posts


Quote:
Originally Posted by Chrisl77 View Post
Could just get this to use as a trunk line.
http://www.kegman.net/products/4-Pro...252d-6846.html
I made somthing similar by pulling 1/4 inch polly lines through 1 inch pipe insulation. It was alot of work and only cost a little less then this stuff.
I was looking at those lines, but concerned that because my coolant wasn't going to be below freezing, it may have trouble cooling through the plastic lines. I'm thinking copper coolant lines will be more effective. Is your coolant in your keezer or in a freezer? How does it do keeping the lines cool?

 
Reply With Quote
Old 05-10-2011, 07:29 PM   #7
Chrisl77
Recipes 
 
Mar 2011
Jackson, New Jersey
Posts: 888
Liked 86 Times on 68 Posts


here is the link to my build. http://www.homebrewtalk.com/f51/diy-...hiller-241066/ The temp inside the insulation stays around 45 degrees with water.

 
Reply With Quote
Reply
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Keezer in the basement tap on 1st floor? Daver77 Kegerators & Keezers 4 11-17-2011 04:48 PM
Keg Trunk Line Cooler naamanf Kegerators & Keezers 6 01-17-2011 07:33 PM
Floor drain or no floor drain for walk-ins? Randar Fermenters 3 11-23-2010 11:10 PM
trunk line start up BSBrewer Brew Stands 3 02-19-2010 05:03 PM
Trunk line or individual? Elfmaze Kegerators & Keezers 3 11-02-2009 05:26 PM


Forum Jump