Home Brew Forums > Home Brewing Beer > Equipment/Sanitation > Blichmann top tier + march pump + therminator configuration help!
Reply
 
Thread Tools
Old 06-30-2011, 03:23 AM   #11
julian81
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jan 2011
Location: Seattle, WA
Posts: 197
Liked 3 Times on 3 Posts

Default

ruffdeezy, I don't suppose you could post the parts list for how you constructed that outlet box?


julian81 is offline
 
Reply With Quote
Old 06-30-2011, 03:31 AM   #12
ruffdeezy
Feedback Score: 0 reviews
Recipes 
 
Join Date: Feb 2009
Location: New West, BC
Posts: 430
Liked 5 Times on 5 Posts

Default

The box was easy to make, I actually thought it would be tough and was worried about it. I got one basic light switch, a waterproof light switch cover, the grey electrical box, and an extension cord. Cut the end off the extension cord and the march pump plug in, wired the black wires from each to the switch, the white wires together, then green wires to the ground screw. I drilled a couple holes through the back of the electrical box and used the extra top tier hardware to mount it securely in the t slot.


Click image for larger version

Name:	Screen shot 2011-06-29 at 8.26.14 PM.png
Views:	1507
Size:	66.9 KB
ID:	28812   Click image for larger version

Name:	waterproofswitch.jpg
Views:	1918
Size:	29.0 KB
ID:	28813   Click image for larger version

Name:	electricalbox.jpg
Views:	1750
Size:	20.3 KB
ID:	28814  
ruffdeezy is offline
 
Reply With Quote
Old 06-30-2011, 03:34 AM   #13
julian81
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jan 2011
Location: Seattle, WA
Posts: 197
Liked 3 Times on 3 Posts

Default

Sweet! I'm headed to the hardware store now, lol. Hopefully they're still open. Thanks a bunch man!
julian81 is offline
 
Reply With Quote
Old 06-30-2011, 05:23 AM   #14
julian81
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jan 2011
Location: Seattle, WA
Posts: 197
Liked 3 Times on 3 Posts

Default

Thanks again ruffdeezy. I actually picked up the exact same parts and will begin my build tomorrow most likely. I got to HD just before they closed
julian81 is offline
 
Reply With Quote
Old 06-30-2011, 06:38 AM   #15
ruffdeezy
Feedback Score: 0 reviews
Recipes 
 
Join Date: Feb 2009
Location: New West, BC
Posts: 430
Liked 5 Times on 5 Posts

Default

nice, posts some pics of your set up, I'd like to see it
ruffdeezy is offline
 
Reply With Quote
Old 06-30-2011, 05:44 PM   #16
julian81
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jan 2011
Location: Seattle, WA
Posts: 197
Liked 3 Times on 3 Posts

Default

Yup, I will as soon as I get this outlet switch installed and unload euro pics from my camera. Also, I'm not totally happy with the placement of my plate chiller, but I don't want to remove literally every burner just to reconfigure. I think that's my only complaint about the top tier. Reconfiguring requires lifting those massive burners off of the brew stand just to slot anything that's below it into different positions.
julian81 is offline
 
Reply With Quote
Old 07-01-2011, 03:18 AM   #17
julian81
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jan 2011
Location: Seattle, WA
Posts: 197
Liked 3 Times on 3 Posts

Default

Switch is installed and working. This is going to make powering the pump SO much easier!
julian81 is offline
 
Reply With Quote
Old 07-01-2011, 03:31 AM   #18
ruffdeezy
Feedback Score: 0 reviews
Recipes 
 
Join Date: Feb 2009
Location: New West, BC
Posts: 430
Liked 5 Times on 5 Posts

Default

It feels pretty good making something like this work although it is pretty basic, I was quite proud of myself never having doing anything electrical at all before. I didn't want to bother with unplugging it all the time so I built my switch right away. Hoping to brew again this weekend, have been done any brewing the past 3 weekends.
ruffdeezy is offline
 
Reply With Quote
Old 07-01-2011, 03:40 AM   #19
julian81
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jan 2011
Location: Seattle, WA
Posts: 197
Liked 3 Times on 3 Posts

Default

Yeah it does feel good. I don't do much electrical work/projects either and I will admit, today's little project is probably why I should never work with electricity again. I foolishly forgot to unplug my extension cord when I went to cut the female plug end off. The breaker tripped and the wire EXPLODED in my hand. Luckily it was plugged into the ONLY GFCI outlet in my garage. For some reason the others aren't. I didn't even get shocked, but the lights going out, and the loud POP and the explosion in front of me was terrifying. I actually know better, but my extension cord was all wrapped up on a shelf, it looked like it was unplugged. Can't be too careful.

Terrifying. But I'm OK, and the project is complete and it works flawlessly. Just happy to be alive at this point, lol.
julian81 is offline
 
Reply With Quote
Old 07-15-2011, 08:07 PM   #20
PorterIV
Feedback Score: 0 reviews
Recipes 
 
Join Date: Nov 2009
Location: Norfolk, VA
Posts: 55
Default

Thanks for posting this discussion and the pictures. I brewed on my TT last night for the first time and really liked it. I have some bugs to work out but was curious how to mount the pump and a Therminator (if I move away from the IC).


__________________
Kegs: Hefe

Primary: Pale Ale
PorterIV is offline
 
Reply With Quote
Reply


Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Brewering Rig concept - single tier with 1 march pump Rhino17 Equipment/Sanitation 8 11-02-2012 03:06 PM
March pumps clogging/ therminator issue tfrost12 Equipment/Sanitation 0 10-15-2010 05:44 PM
Blichmann Therminator Yambor44 Equipment/Sanitation 15 05-26-2010 02:21 AM
blichmann therminator lehr Equipment/Sanitation 9 11-05-2009 01:06 AM


Forum Jump

Newest Threads

LATEST SPONSOR DEALS