The great stainless single tier begins! - Page 2 - Home Brew Forums
Home Brew Forums > Home Brewing Beer > DIY Projects > Brew Stands > The great stainless single tier begins!

Reply
 
Thread Tools
Old 03-30-2011, 04:30 AM   #11
HHP
Recipes 
 
Nov 2010
Harker Heights, Texas
Posts: 376
Liked 6 Times on 5 Posts


I know it is typically rude to talk "money" with people, but we have this great electronic barrier so I figure I can ask.

How much do you expect the materials to cost for this rig? I am planning my rig for when I return from Iraq and I would like to be able to consider stainless as an option, but I am unfamiliar with the price.



 
Reply With Quote
Old 03-30-2011, 04:35 AM   #12
SirBC
HBT_LIFETIMESUPPORTER.png
 
SirBC's Avatar
Recipes 
 
Feb 2011
Bay Area, CA
Posts: 82
Liked 3 Times on 3 Posts


After I did my first brew on my $$$ Morebeer sculpture, the one thing that bugged me was that the pumps had no covers. So I like the "pumps with covers" detail.



 
Reply With Quote
Old 03-30-2011, 11:42 PM   #13
doctorsbro
Recipes 
 
Mar 2011
council bluffs, iowa
Posts: 174
Liked 2 Times on 2 Posts


Quote:
Originally Posted by HardHatPat View Post
I know it is typically rude to talk "money" with people, but we have this great electronic barrier so I figure I can ask.

How much do you expect the materials to cost for this rig? I am planning my rig for when I return from Iraq and I would like to be able to consider stainless as an option, but I am unfamiliar with the price.
Well if you were to build it out of all tube like most do the 1.5"x1.5"x.125" wall tube goes for around $8-$9 per foot right now, the 12 gauge stainless sheet is about $10 per square foot when you buy an entire sheet, price would go up with smaller quantities and also cut charges apply. If you were to go to a welding shop with a drawing and have them build the entire thing for you out of stainless i would think it would be in the $1000+ range with windscreens, caster wheels etc, and a bare mill finish(no polishing etc)typical hourly rate at a welding shop is about $75-$125 an hour(higher end if tig welding). But if you can cut and weld all the pieces for your stand i would say youd have about $500 in it with all of your materials and supplies, and another $100+ into supplies for sanding and polishing if you allready have the tools to do so.

 
Reply With Quote
Old 03-30-2011, 11:44 PM   #14
doctorsbro
Recipes 
 
Mar 2011
council bluffs, iowa
Posts: 174
Liked 2 Times on 2 Posts


Quote:
Originally Posted by SirBC View Post
After I did my first brew on my $$$ Morebeer sculpture, the one thing that bugged me was that the pumps had no covers. So I like the "pumps with covers" detail.

you know honestly these pumps do not need covers, they are rated for high temps and are a sealed mag drive motor anyway so theres no exposed electric connections etc, im really just putting them on there for more bling factor, more polished stainless=more bling

 
Reply With Quote
Old 03-31-2011, 01:14 AM   #15
doctorsbro
Recipes 
 
Mar 2011
council bluffs, iowa
Posts: 174
Liked 2 Times on 2 Posts


well i got some more done today, i bent all of the parts on the press brake today for the stand, will be punching all of the holes in the windscreens in the morning so i can drop them off to get rolled into rings when i pick up the tubing, i should be all ready to go for welding it together on saturday, heres a few pictures

beast of a press brake, picked this one since its the most precise, and that it took 170 tons to bend the 67" piece of stainless in a small "V" die, this is a 14' 200 ton machine


heres the front panel portion of the stand


the center dividers between burners


the ends




Tomorrow night i will be notching the parts i bent so they will fit together and will be ready to weld

 
Reply With Quote
Old 03-31-2011, 09:26 AM   #16
ratfarmer
Recipes 
 
Sep 2010
Redmond, WA
Posts: 79
Liked 1 Times on 1 Posts


Whoa!
I'll be watching this one!

 
Reply With Quote
Old 03-31-2011, 11:55 AM   #17
Ohio-Ed
HBT_LIFETIMESUPPORTER.png
 
Ohio-Ed's Avatar
Recipes 
 
Nov 2008
Posts: 2,067
Liked 20 Times on 19 Posts


Gotta watch this build.

 
Reply With Quote
Old 03-31-2011, 01:28 PM   #18
strat_thru_marshall
Recipes 
 
Mar 2010
Oklahoma City
Posts: 1,641
Liked 31 Times on 25 Posts


subscribed. your workplace must be pretty cool, letting you use all the machines for personal projects. Looks like its going to turn out awesome.

 
Reply With Quote
Old 03-31-2011, 02:49 PM   #19
FishFace
Recipes 
 
Dec 2010
GranitBay, CA
Posts: 77

That looks awesome. I was going to have my centered dropped for more space, but in the end had to lift when I realized that when wheeling, I need more clearance. The low-rider wasn't going to work for me, so I had to lift the thing. Can't wait to see pictures.

 
Reply With Quote
Old 03-31-2011, 02:51 PM   #20
FishFace
Recipes 
 
Dec 2010
GranitBay, CA
Posts: 77

Pump covers - I just formed some acrylic around mine. All I needed was a heat gun. I'll take some pictures and post them. My brew rig is under constant upgrading.



 
Reply With Quote
Reply
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Stainless Steel Single Tier Stand Build strat_thru_marshall Brew Stands 56 01-25-2013 03:26 AM
Single Tier vs. Two Tier Build swatman260 Brew Stands 24 06-16-2011 12:02 AM
New single tier rig purplehaze Brew Stands 4 03-19-2011 02:35 PM
my single tier hotrodbrew Brew Stands 1 08-30-2010 10:20 PM
3-Tier AND Single-tier in one menschmaschine Brew Stands 21 04-26-2009 01:26 AM


Forum Jump