New Brewery Build is Complete - Page 3 - Home Brew Forums
Home Brew Forums > Home Brewing Beer > DIY Projects > Brew Stands > New Brewery Build is Complete
Cool Brewing Giveaway - Supporting Membership Drive & Discount

Reply
 
Thread Tools
Old 02-24-2011, 07:53 PM   #21
jermanimal
Recipes 
 
Dec 2009
Des Moines, IA
Posts: 67
Liked 1 Times on 1 Posts


Quote:
Originally Posted by robbiex0r

Do you control the flame with those red-handled valves at all? or do you never run more than one burner at once? Trying to figure out how to plumb my stand. I think I'll want to do at least 2 burners at once, if I want to do some decoctions or turbid mashing.
I can get a little control, but not much. Run top two at same level and warm up sparge at same time as strike water in mash tun. After start sparge, don't use mash burner and only heat wort in kettle and maintain sparge temp. Not ideal, if I was going to add more control with needle valve after top mash ball valve.



 
Reply With Quote
Old 08-31-2011, 08:05 AM   #22
lovethepirk
Recipes 
 
Aug 2011
Naples, FL
Posts: 1

Where did you get the steel?

Thank.

 
Reply With Quote
Old 09-02-2011, 04:18 PM   #23
jermanimal
Recipes 
 
Dec 2009
Des Moines, IA
Posts: 67
Liked 1 Times on 1 Posts


Local steel shop, just look in Yellow pages and find a local shop. Not worth it to order, steel is heavy.

 
Reply With Quote
Reply
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
My Keezer build.. finally complete metaltim Kegerators & Keezers 1 02-21-2011 07:19 PM
Brutusesque 20 build almost complete p4ck37p1mp Brew Stands 33 04-16-2010 04:30 PM
Brew stand build - almost complete! Brewme Brew Stands 2 06-10-2009 03:01 AM


Forum Jump