BCS-462 Build Schematic - Home Brew Forums
Home Brew Forums > Home Brewing Beer > Electric Brewing > BCS-462 Build Schematic
Cool Brewing Corny 5G & Mini Giveaway

Reply
 
Thread Tools
Old 01-14-2011, 12:22 AM   #1
mrlisk
Recipes 
 
Join Date: Oct 2009
Location: CT
Posts: 78

So after some research, I think I've decided I'm going to go the route of the BCS-462 over the standalone PID. I think the fact that it can control many different things in one interface will cut down on the amount of equipment and separate "operations" I have going on. Here's a draft schematic i put together. Does anyone see any glaring problems?

I'm hoping to eventually expand this unit to running my kegerator and fermentation chambers. It will be great to be able to monitor what's going on outside in my brewhaus, and not have to walk out there everyday just to check temps (because it's sure cold outside!!)



__________________
Swamp Yankee Brewery

On deck: Black Bear Honey Porter
Primary: Empty
Secondary: Empty
Keg 1: Empty :(
Keg 2: Grandpa's IPA

Reason: Change premise of thread to include everything going on with the build

 
Reply With Quote
Old 01-14-2011, 03:23 AM   #2
ranchonodinero
HBT_SUPPORTER.png
Recipes 
 
Join Date: Dec 2010
Location: DFW, TX
Posts: 66
Liked 4 Times on 4 Posts
Likes Given: 13


What program did you use to create your diagram? I about to embark on a build, but am considering using both propane and electric. The weather is pretty moderate for the most part in North Texas, but there are times when I'd like to brew in the garage.



 
Reply With Quote
Old 01-14-2011, 04:21 AM   #3
samc
Recipes 
 
Join Date: Aug 2008
Location: Portland OR
Posts: 5,373
Liked 62 Times on 58 Posts
Likes Given: 29


You might want to do a Manual/off/auto switch for the pump. Makes priming & clean up a lot easier.

 
Reply With Quote
Old 01-14-2011, 11:01 AM   #4
mrlisk
Recipes 
 
Join Date: Oct 2009
Location: CT
Posts: 78

@ranch - I actually wound up using powerpoint. I spent some time trying to find something better, but couldn't. Good luck with your build!

@samc - It's something I'm considering. with the web interface for the BCS i can tap a button to make the pump go on and off when i want it to, so it's like having a 2 position switch, but I don't know that I want a digital switch between me and the pump if something were to go wrong. It's also half the reason why i'm putting a switch on the elements (the other reason being i want to prevent turning both on at once)
__________________
Swamp Yankee Brewery

On deck: Black Bear Honey Porter
Primary: Empty
Secondary: Empty
Keg 1: Empty :(
Keg 2: Grandpa's IPA

 
Reply With Quote
Old 01-14-2011, 11:55 AM   #5
P-J
HBT_LIFETIMESUPPORTER.png
Recipes 
 
Join Date: Mar 2010
Location: Charlotte, NC
Posts: 3,337
Liked 300 Times on 235 Posts
Likes Given: 496


I like the style you chose to diagram your plan. It makes a visual that is easy to follow. All of my diagrams are done in a similar way.

Good Job!

 
Reply With Quote
Old 01-14-2011, 02:26 PM   #6
wyzazz
Recipes 
 
Join Date: Aug 2009
Location: Atwater, OH
Posts: 4,252
Liked 52 Times on 49 Posts
Likes Given: 84


Just a quick note, most folks here use 40a SSR's, it's been said that they will last longer because of the lower heat generated vs the 25a versions. I found some Crydom D2440's on eBay for a great price that I picked up for my future build.
__________________
Quote:
Originally Posted by Revvy View Post
And I'd like to see my 1.080 beers ready from grain to glass in a week, and served to me by red-headed twin penthouse pets wearing garter belts and fishnet stockings, with Irish accents, calling me "master luv gun," but we can't always get what we want can we? :)

 
Reply With Quote
Old 01-14-2011, 11:25 PM   #7
mrlisk
Recipes 
 
Join Date: Oct 2009
Location: CT
Posts: 78

I just ordered some 25A SSRs with heatsinks...drats. Anyone know what the amps being pulled through each SSR might be for the configuration i put in the OP? Is it half of the total amperage being pulled by the element?

edit: or is it the same number of amps as the 4500W/240V = 18.75A
__________________
Swamp Yankee Brewery

On deck: Black Bear Honey Porter
Primary: Empty
Secondary: Empty
Keg 1: Empty :(
Keg 2: Grandpa's IPA

 
Reply With Quote
Old 01-15-2011, 12:39 AM   #8
P-J
HBT_LIFETIMESUPPORTER.png
Recipes 
 
Join Date: Mar 2010
Location: Charlotte, NC
Posts: 3,337
Liked 300 Times on 235 Posts
Likes Given: 496


Quote:
Originally Posted by mrlisk View Post
I just ordered some 25A SSRs with heatsinks...drats. Anyone know what the amps being pulled through each SSR might be for the configuration i put in the OP? Is it half of the total amperage being pulled by the element?

edit: or is it the same number of amps as the 4500W/240V = 18.75A
It will be 18.75A but don't worry about that. The 25A SSR can handle it without a problem as long as you provide a heat sink for it with decent air flow around the heat sink fins.

No sweat.

 
Reply With Quote
Old 01-15-2011, 12:43 AM   #9
mrlisk
Recipes 
 
Join Date: Oct 2009
Location: CT
Posts: 78

OK - great. I plan on using heatsinks on the SSRs controlling the elements and putting a muffin fan(s) on the control panel to regulate the heat.

I'm guessing no heatsink is required for my pump SSRs. I think the pump will pull about 4A at 30 watts (1/25 HP) with 120V.
__________________
Swamp Yankee Brewery

On deck: Black Bear Honey Porter
Primary: Empty
Secondary: Empty
Keg 1: Empty :(
Keg 2: Grandpa's IPA

 
Reply With Quote
Old 01-15-2011, 12:45 AM   #10
mrlisk
Recipes 
 
Join Date: Oct 2009
Location: CT
Posts: 78

On another note, does anyone know the difference between a T2 and T3 type thermistor? Grainger has a decent selection of inexpensive stainless thermistor probes with stainless compression fittings, but i'm hung up on the T2/T3 detail.

Here's a link: Thermistor Probes


__________________
Swamp Yankee Brewery

On deck: Black Bear Honey Porter
Primary: Empty
Secondary: Empty
Keg 1: Empty :(
Keg 2: Grandpa's IPA

 
Reply With Quote
Reply

Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
My electric build. ikonis Electric Brewing 17 03-30-2012 02:09 PM
How long did it take to build your HERMS? dmfa200 Electric Brewing 16 02-21-2012 08:44 PM
New Electric Build eric_pwb Electric Brewing 19 03-10-2011 09:03 PM
Three E's Electric Brewery Build EuBrew Electric Brewing 54 01-08-2011 08:11 AM
Another "Check my schematic" thread. ExHempKnight Electric Brewing 5 12-11-2010 04:40 PM


Forum Jump