I'm in the process of building a HERMS and am curious as to how long it took you guys.
I would also like to know how much you spent, ball-park figure, not counting your vessels.
Just wanting to know so that I can tell if I'm going overboard or being cheap.

 
Reply With Quote
Old 01-06-2011, 02:18 PM   #2

It took me around 4 months, give or take a few weeks. There's a lot of unknowns that go into it unless you're following someones plans to the "T".

Ball-park estimate of cost - $800 not including the vessels. It helps when you weld or know a welder, and you only use one pump.
__________________
He who drinks beer sleeps well. He who sleeps well cannot sin. He who does not sin goes to heaven.

Another HERMS rig...

 
Reply With Quote
Old 01-06-2011, 03:01 PM   #3
Cpt_Kirks
Recipes 
 
Sep 2008
Lakeland TN
Posts: 3,723
Liked 47 Times on 41 Posts


It depends on what you want.

If you want a all SS, fully automated system, it's going to cost more and take a lot of time.

If you just put a copper coil into your HLT and control it all manually, it will be fairly cheap and quick.

 
Reply With Quote
Old 01-06-2011, 03:02 PM   #4
FireBrew63
Recipes 
 
Nov 2010
Lakebay, WA
Posts: 266
Liked 5 Times on 5 Posts


Actual work hours to build the frame and system....about 20. Cost: frame... $25. +pump....$110 + HERMS coil....$72 +valves, QD's, assorted fittings, silicon hose....$400 So, about $630 over a 3 month period. I bought old bed frames from a thrift store for the frame and used self drilling screws to assemble.

 
Reply With Quote
Old 01-06-2011, 03:17 PM   #5
dmfa200
Recipes 
 
Feb 2010
Madison
Posts: 527
Liked 8 Times on 7 Posts


Quote:
Originally Posted by Suthrncomfrt1884 View Post
It took me around 4 months, give or take a few weeks. There's a lot of unknowns that go into it unless you're following someones plans to the "T".

Ball-park estimate of cost - $800 not including the vessels. It helps when you weld or know a welder, and you only use one pump.
Just so happens I know one...Me!
Yeah that has kept my brewing costs way down. I'd probably be brewing on the stove if I wasn't a welder.

 
Reply With Quote
Old 01-06-2011, 07:09 PM   #6
CoalCracker
Recipes 
 
Sep 2009
Macungie, Pa
Posts: 1,688
Liked 106 Times on 65 Posts


Started in May 2010 and still critiqueing it little by little. It's never perfect for me. I'm always improving. Probably about 750 spent.

 
Reply With Quote
Old 01-06-2011, 09:28 PM   #7

Quote:
Originally Posted by dmfa200 View Post
Just so happens I know one...Me!
Yeah that has kept my brewing costs way down. I'd probably be brewing on the stove if I wasn't a welder.
I didn't figure the valves and fittings into my previous estimate either. I spend close to $300 on quick connects, valves, sight gauges, thermometers, etc. Plus, another $100 to have my couplings welded since my uncle that welds doesn't have the equipment to do stainless.

I think the kettles is where it really starts to add up. The stand and control panel are nothing compared to what I spent on my kegs.
__________________
He who drinks beer sleeps well. He who sleeps well cannot sin. He who does not sin goes to heaven.

Another HERMS rig...

 
Reply With Quote
Old 01-06-2011, 09:43 PM   #8
Tiber_Brew
It's about the beer.
HBT_LIFETIMESUPPORTER.png
 
Tiber_Brew's Avatar
Recipes 
 
Apr 2010
Upper Peninsula, Michigan
Posts: 2,411
Liked 208 Times on 146 Posts


Including the electric control panel, actual construction time was about 2 months. I used every available weekend and evening I had. Also welded and CNC'ed my own stuff, so no waiting in some shop's queue.

Cost: about $1500 or so. Still gotta put together a final parts list, then I'll have a better idea.

TB
__________________
On tap:
1. Imperial Oatmeal Espresso Stout 2. Michigan IPL 3. Kölsch 4. Kentucky Common 5.[Nitrogen] Oat Blonde
Primary:
1. Helles 2. Helles 3. none 4. none 5. none 6. none
Secondary:
1. Brett Ale 2. none 3. none 4. none 5. none
Bottled:
About 23 gallons of beer & 3 gallons of mead
Kegged & conditioning:
Rye Barrel aged DIPA, Altbier, Helles x2

 
Reply With Quote
Old 01-09-2011, 03:18 AM   #9
kernal74
Recipes 
 
Aug 2009
Posts: 34

Started a year ago, never satisfied! One day it will be done.

 
Reply With Quote
Old 01-10-2011, 06:02 AM   #10
LakewoodBrew
Recipes 
 
Jul 2009
Posts: 5,876
Liked 25 Times on 23 Posts


Done is a relative term for most of us I think.... It's pretty much brew a batch or two then tweak the rig, then brew some more.

I wouldn't be able to to put a number on my rig cost at this point but I know there are several (maybe 5) hundred dollars the have been put into it in recent history.

My recommendation - design it out in detail before you buy, cut or weld anything. Electrical schematics, hydraulic and gas connection diagrams and physical assembly layout are all critical. But most of all, have fun and keep brewing.

 
Reply With Quote


Reply
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Future Proofing HERMS Project mrlisk Electric Brewing 9 01-10-2011 06:10 AM
The Herms Gate f404 Electric Brewing 15 11-18-2010 07:16 PM
Various E-Herms Questions Scut_Monkey Electric Brewing 13 11-16-2010 06:08 PM
E-HERMS--What kind of efficiency should I be getting? utopeya Electric Brewing 34 11-11-2010 08:28 PM
Questions for electric herms guys..... wildwest450 Electric Brewing 21 10-22-2010 06:42 PM


Forum Jump