Keg Connection New Inline Flow Control Valve Giveaway

Home Brew Forums > Home Brewing Beer > Electric Brewing > Double check my circuit is wired safely
Thread Tools
Old 12-10-2010, 09:06 PM   #11
Feedback Score: 0 reviews
Join Date: May 2008
Location: Binghamton, NY
Posts: 314
Liked 9 Times on 7 Posts


Sorry if I am repeating myself here but I want to be exact so I can place an order and dont have to reorder later.

120v, 10A max draw I can get the Dual Pole 10A D-curve breaker and connect both the Hot and Neutral wires to it. This is the one you recommended.

24v AC 2A max draw from the 2x gas valves, I need a 2A breaker for just the hot side. Like this one.

And for the DC 3A PSU I need a 3A B curve breaker like this one.

I know I could use a fuse, but if I am already putting in a DIN rail with 3x breakers, might as well make it 4....They have a nice 10cm DIN rail for $1 that looks like it will work nicely.

All of the valves and electronics are on 12v so I want it fast acting. Just 2 gas valves are on the 24v line.

Black Heart Brewery
blackheart is offline
Reply With Quote
Old 12-10-2010, 09:42 PM   #12
Feedback Score: 0 reviews
Join Date: Nov 2010
Location: Avon Lake, Ohio
Posts: 24

I posted the link to the 2-pole breaker because it was the equivalent (but less-expensive) product to the one you had listed. You really only need a single pole breaker for the 120v line. Aside from that, it looks pretty good to me.
MarkInOhio is offline
Reply With Quote

Thread Tools

Similar Threads
Thread Thread Starter Forum Replies Last Post
Fermentation Temperature Controller Sanity Check bacampbe Electric Brewing 6 01-24-2015 04:52 AM
Sanity check trigger Electric Brewing 46 12-18-2010 12:41 AM
Control Panel Design Check thelorax121 Electric Brewing 0 11-25-2010 11:56 PM
Why only a single gfci main supply, but no individual circuit protection??? MonkeyWrench Electric Brewing 16 11-15-2010 04:56 AM

Forum Jump

Newest Threads