How to build a control panel (part 1) - Page 21 - Home Brew Forums
Home Brew Forums > Home Brewing Beer > Electric Brewing > How to build a control panel (part 1)

Reply
 
Thread Tools
Old 01-13-2011, 03:50 AM   #201
kal
HBT_SUPPORTER.png
 
kal's Avatar
Recipes 
 
Nov 2006
Ottawa, Canada
Posts: 2,507
Liked 347 Times on 224 Posts


Wow. This one looks like an *exact* replica. Cool! Nice work!

Kal



 
Reply With Quote
Old 01-13-2011, 04:38 PM   #202
Maltose
Recipes 
 
May 2010
Frederick, MD
Posts: 471
Liked 2 Times on 2 Posts


Here's my Kal-inspired CP:




 
Reply With Quote
Old 01-14-2011, 12:38 AM   #203
Maltose
Recipes 
 
May 2010
Frederick, MD
Posts: 471
Liked 2 Times on 2 Posts


Kal...quick question for you.

I've modeled my CP after yours, minus the amp and volt meter. I've also left out the 50 amp shunt. Here is a schematic from your website:



You've got 10 AWG wire going from the relay to the shunt, then 14 AWG wire from the shunt to the terminal strip. Since I don't have a shunt, can I just use 14 AWG from the relay to the strip or do I need to use 10 AWG?

 
Reply With Quote
Old 01-14-2011, 01:58 AM   #204
kal
HBT_SUPPORTER.png
 
kal's Avatar
Recipes 
 
Nov 2006
Ottawa, Canada
Posts: 2,507
Liked 347 Times on 224 Posts


Hi!

You can use 14 AWG from the relay to the Neutral bus. No issues.

Just make sure to use 10 AWG from the relay (not shunt) to the SSRs in the later diagram:



Kal

 
Reply With Quote
Old 01-14-2011, 02:45 AM   #205
Maltose
Recipes 
 
May 2010
Frederick, MD
Posts: 471
Liked 2 Times on 2 Posts


Quote:
Originally Posted by kal View Post
Hi!

You can use 14 AWG from the relay to the Neutral bus. No issues.

Just make sure to use 10 AWG from the relay (not shunt) to the SSRs in the later diagram:



Kal
And 10 AWG from the "Power In" relay to the HOT bus, or is 14 AWG suitable? I don't have a shunt.

 
Reply With Quote
Old 01-14-2011, 02:50 AM   #206
kal
HBT_SUPPORTER.png
 
kal's Avatar
Recipes 
 
Nov 2006
Ottawa, Canada
Posts: 2,507
Liked 347 Times on 224 Posts


Sorry, yes, 14 AWG fromr the power in relay to the HOT bus. (That's what I meant to say).

Kal

 
Reply With Quote
Old 01-14-2011, 02:54 AM   #207
konrad
Recipes 
 
Aug 2008
Central, MA
Posts: 93

I wonder how many control panel builds you inspired. I had a hard time finding heating elements. Amazon store is sold out.

 
Reply With Quote
Old 01-14-2011, 04:05 AM   #208
Scut_Monkey
Recipes 
 
Jan 2009
Pittsburgh, Pennsylvania
Posts: 2,656
Liked 14 Times on 14 Posts


Quote:
Originally Posted by konrad View Post
I wonder how many control panel builds you inspired. I had a hard time finding heating elements. Amazon store is sold out.
That stinks. I will be building an almost exact replica so count me in. I have wanted an electric system but didn't have the knowledge to design one myself. However, I most definitely can build one especially with such great directions. The nice thing is I wanted a single tier HERMS system which is exactly what this control panel and system is designed for. I was psyched to find Kals website. Perfect timing for me.

 
Reply With Quote
Old 01-14-2011, 01:43 PM   #209
kal
HBT_SUPPORTER.png
 
kal's Avatar
Recipes 
 
Nov 2006
Ottawa, Canada
Posts: 2,507
Liked 347 Times on 224 Posts


Give it a day or two. They'll be back in stock. Happens all the time.

Kal

 
Reply With Quote
Old 01-14-2011, 04:03 PM   #210
NattyBrew
Recipes 
 
Mar 2009
Cincinnati, Ohio
Posts: 207
Liked 3 Times on 3 Posts


Quote:
Originally Posted by konrad View Post
I wonder how many control panel builds you inspired. I had a hard time finding heating elements. Amazon store is sold out.
It seems like Amazons only source for the Camco 5500W elements is Rons Hardware and it appears that the popularity of the element for Kals build and other electric brewing rigs seems to be killing their supply pretty quickly. They show up in stock every once in a while via Amazon so you just have to hope that you time it right.

If anyone is getting frustrated trying to find them I found a site which operates a local True Value outlet and they had about 20 elements in stock. Clearly the operation is for a hometown hardware store but don't be too scared away by the 1995 look of their webpage. I was able to order online and pay via Paypal and had the elements shipped perfectly fine to me in about a week. Just follow the link below to go directly to the Camco listing at (and you'll love the name) "Honey Do Hardware". Classic.

https://www.honeydohardware.com/come...dProduct=44144



 
Reply With Quote
Reply
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Electric brewery build nostalgia Electric Brewing 200 12-29-2015 02:22 AM
240VAC Toolbox Control Panel with Pics passedpawn Electric Brewing 104 01-05-2012 04:15 AM
The Graham Box Control Unit from more beer killian Electric Brewing 3 12-03-2010 06:23 AM


Forum Jump