Using 2 simmerstats to control 4500W/5500W element - Home Brew Forums

Register Now!
Home Brew Forums > Home Brewing Beer > DIY Projects > Brew Stands > Using 2 simmerstats to control 4500W/5500W element

Thread Tools
Old 04-08-2010, 07:11 PM   #1
Mar 2008
Edmonton, Alberta, Canada
Posts: 50
Liked 1 Times on 1 Posts

I am in the process of building an electric kettle (converted keg). I plan on using a 240V/4500W (maybe 5500W) element in the kettle and I am in the process of planning out my control strategy. I really like the idea of using a simmerstat to control the element. Unfortunately, I have yet to find a source for a 240V simmerstat rated for more than 15A (4500W = 18.8A, 5500W = 22.9A). So I was thinking, what if I used 2 simmerstats in parallel, one for each hot leg of the incoming power, to control the 240V element? Is this even remotely feasible or am I barking up the wrong tree? I realize I can use a PID setup to control the kettle, but I am hoping to build a more contained kettle like the one done by tdiowa in this thread so no need to post with a response like "just use a PID...". Thanks for any and all input.



Reply With Quote
Old 04-08-2010, 10:10 PM   #2
Aug 2009
Atwater, OH
Posts: 4,313
Liked 55 Times on 52 Posts

Hmmm, I don't think it would work unless you could keep both of the simmerstats at the EXACT same setting all the time. I believe that would trip the GFCI.
Originally Posted by Revvy View Post
And I'd like to see my 1.080 beers ready from grain to glass in a week, and served to me by red-headed twin penthouse pets wearing garter belts and fishnet stockings, with Irish accents, calling me "master luv gun," but we can't always get what we want can we? :)

Reply With Quote
Old 04-08-2010, 10:38 PM   #3
Aug 2008
Bridgewater, MA
Posts: 114
Liked 4 Times on 3 Posts

it won't work. each hot leg sees the full current. using 2 simmerstats doesn't divide the current in half. if you haven't read it, there's an electrical primer on here somewhere that will help you out a lot.

keg 1: 3 hearted ale
keg 2: british strong ale
keg 3: munich helles
keg 4: empty

on deck: more IPA.

Reply With Quote
Old 04-08-2010, 11:08 PM   #4
Feb 2009
Albuquerque, NM
Posts: 320
Liked 2 Times on 2 Posts

You could use 2 2500watt 240V elements and use a separate simmerstat for each element.

I think bargainfittings has a thread somewhere on here where he uses 3 stove elements on one pot with each having its own simmerstat. You'd do the same thing except your elements would be immersed.

Reply With Quote
Old 04-09-2010, 02:13 AM   #5
Marsdude's Avatar
Jan 2010
Fort Collins, CO, Colorado
Posts: 472
Liked 2 Times on 1 Posts

I have been thinking about using simmerstats for an electric kettle also. I also have not been able to find anything above 15A. Using them in parallel will not work so I have been leaning toward the idea that "leboeuf" posted - using two elements.

Reply With Quote
Old 04-09-2010, 02:14 AM   #6
Registered User
Feb 2010
Posts: 728
Liked 8 Times on 7 Posts

What is more cost effective, 2 elements and 2 simmerstats, or one element and one PID?

Reply With Quote
Old 04-09-2010, 03:24 PM   #7
Jul 2006
Posts: 1,276
Liked 9 Times on 9 Posts

Yea, that always seems to be the final conclusion. As it stands, the current most economical method is 1 element and 1 pid.

And, with controllers like the Brewtroller available for under 100 bucks, its even cheaper as you implement more than one element or bit of control!
MrShake - Top Hat Brewery and Tapworks
Owner of BrewTroller

Reply With Quote
Old 04-09-2010, 04:19 PM   #8
Feb 2009
Albuquerque, NM
Posts: 320
Liked 2 Times on 2 Posts

Really for a boil kettle, PID temperature control is completely useless.
You can make/buy a pwm controller for really cheap and use it to control an SSR. In essence you would make your own high power simmerstat.

It's common to see people use an expensive PID controller in "manual mode" to control their boil kettle. "Manual mode" takes the unit out of PID control and puts it to user defined pwm. Kind of an expensive work around....

Reply With Quote
Old 04-11-2010, 04:10 AM   #9
Feb 2008
Yokota AB, Japan
Posts: 84
Liked 2 Times on 2 Posts

If you can find a rotary-knob, 120V-based PWM controller with an LED display for less than the cost of the PID, I'd like to see it. The only thing the PID lacks is the rotary knob.

And if you use the PID on both the HLT and BK, it's like getting the PWM controller built into the PID for free. Bonus - you can keep your control box 120-240V without fiddling with 12V adapters.

Reply With Quote
Old 04-15-2010, 03:31 PM   #10
Oct 2005
Iowa City
Posts: 141
Liked 4 Times on 4 Posts

Saw the post today. I guess I have a couple of questions. How big a kettle are you using? My element that I use is 3200w which matches the amperage of the simmerstat. Do you really need 2 elements?

I am currently on my fourth generation of this design. I have upgrade from a 7 gallon kettle to a 12 gallon kettle. Which means I have gone from 5 gallon batches to 7.5 gallon batches. My boil time for my big kettle (70 degrees to 212) and with 9.5 gallons of water to start is 40 - 50 minutes. With the smaller kettle (70 - 212) was 30 minutes.

I am a all grain brewer who batch sparges and with a larger batch I am at 3 1/2 - 4 hours.

If you have any other questions let me know and I will try to help.


Reply With Quote
Thread Tools

Similar Threads
Thread Thread Starter Forum Replies Last Post
5500W RIPP ultra-low density element in Canada? kal Brew Stands 11 11-05-2015 12:37 AM
5500W Heating Element, how do I install it? The Pol Brew Stands 15 06-18-2010 03:33 AM
Will this do what I need for a heating element control? RedIrocZ-28 Brew Stands 9 12-28-2009 05:33 PM
NEW 5500w RIPP ULWD element & SS lock nut cyberbackpacker For Sale 2 12-11-2009 10:42 PM
3500W, 4500W or 5500W The Pol Brew Stands 242 12-17-2008 12:44 AM

Forum Jump