Brewery Build - Single Tier HERMS - Home Brew Forums
Register Now For Free!

Home Brew Forums > Home Brewing Beer > DIY Projects > Brew Stands > Brewery Build - Single Tier HERMS

Reply
 
Thread Tools
Old 11-24-2009, 03:04 AM   #1
mplutodh1
 
mplutodh1's Avatar
Recipes 
 
Jan 2006
Sammamish, WA
Posts: 237
Liked 7 Times on 7 Posts



Preface:
This project began, as many home brewing projects do, as a discussion over a few beers, debating the possibilities, costs and rewards of building a small scale brewery as a family. A father, the engineer, and two sons, the oldest of which is project driven OCD, the other the fun loving jokester who would rather brew and drink then design and build. Well, combine the three of us, a passion to brew more, consistent and higher quality brews and we're bound to spend some money and time and build something.

The Brewery at a Glance
With inspiration coming from the designs and ideas of several brewers throughout the world, we've taken our favorite aspects of what we've seen, tweaked and added a few of our own touches.
  • Single tier, wheelbarrow style for mobility
  • Low profile design
  • Tilting mounts for kettles for easy cleaning
  • HERMS design w/ability for direct fire on all kettles
  • 3 Keggle brew kettle system
  • 2 March pumps for wort / liquid transfer
  • Propane fuel for mobility
Parts List & Details
DRAFT List - I'll continue to update as we move through our build and will post our final build list with prices, links, and part numbers were applicable at the completion of the build.



Brewery Design Mock-Up
See Post #2 in this thread.

Brewery Process Diagrams
Coming Soon...

Photos














Updates:
[November 23, 2009] - I plan to update this thread as we move through our design, build and brew process with our brewery.
[November 27, 2009] - Added 3D model sketch (will add Sketch-Up files at a later date for anyone interested)
[December 15, 2009] - Added updated 3D model (I'll clean up all the models at the end and update this thread with all the "FINAL" images)
[December 18, 2009] - Updated build list to reflect some recent decisions around our quick disconnects, gas control, and welded fittings.
[December 21, 2009] - Added Final Drawings, measurements & multiple angles.
[January 4, 2010] - Gave the green light to our welder to order the frame materials from the metal supplier and begin welding.
[January 20, 2010] - Updated build list with most recent parts, prices, etc. Posted the first photos of our build progress. Picked up the stand from our welder tonight and bolted on the wheels and handle.
[February 6, 2010] - Keg tops cut off and lids fitted.
[February 22, 2010] - Control panel box mounted, kegs drilled and bolted to tippy trays, burners mounted to the burner boxes, HERMs coil wound.
[March 1, 2010] - Burner boxes mounted, more gas plumbing fitted.
[March 14, 2010] - Drilled kegs and prepped for welding.
[April 4, 2010] - Received the kegs back from GreenMonti and dry mounted the fittings.
[April 10, 2010] - Completed gas assembly, installed fittings to tuns, built pump brackets and mounted pumps, assembled HERMS coil and dip tubes, cut and assembled fluid hoses.
[April 17, 2010] - Electrical build day; mounted switches, Love controllers and timer to control panel; fired up the power for the first time and everything seems to be working.


-------------------------------------------------

Thank You
Thank you for the inspiration, design ideas, education & assistance:
HomeBrewTalk.com, Kladue, Sawdustguy, Jaybird, Bobby_M, Nicksteck, Snake10, Doug Cameron & Full Sail Brewing Co., GreenMonti

Also, special thank you to our welder, Micah.





.


 
Reply With Quote
Old 11-24-2009, 03:06 AM   #2
mplutodh1
 
mplutodh1's Avatar
Recipes 
 
Jan 2006
Sammamish, WA
Posts: 237
Liked 7 Times on 7 Posts


Brewery Design Mock-Up

Stand View Front Right:


Stand View Front Left:


Stand View (Underside):


Stand Measurements:


Keggle Tray:


Stand Lift Handle:


Individual Burner Boxes / Wind Screens (will be individually adjustable via threaded rods on the sides):


Control Panel Arm:


 
Reply With Quote
Old 11-24-2009, 03:21 AM   #3
passedpawn
Waste Allocation Load Lifter - Earth Class
HBT_ADMIN.png
 
passedpawn's Avatar
Recipes 
 
Apr 2009
☼ Clearwater, FL ☼
Posts: 26,620
Liked 7036 Times on 4168 Posts


Looks good except for one thing. The head is a little oblong. That won't work at all.
__________________
- Andrew

hunterlab Likes This 
Reply With Quote
Old 11-24-2009, 07:35 AM   #4
BrewBeemer
HBT_SUPPORTER.png
Recipes 
 
Feb 2006
small island paradise, the lost atoll
Posts: 3,500
Liked 25 Times on 25 Posts


Thats one very nice posting with everything listed as well your stand, congrats it looks like a great project.
__________________
Bier Jagdwaffe... Bier 30 zeit.....~~=o&o>..........

 
Reply With Quote
Old 11-24-2009, 02:52 PM   #5
mplutodh1
 
mplutodh1's Avatar
Recipes 
 
Jan 2006
Sammamish, WA
Posts: 237
Liked 7 Times on 7 Posts


Quote:
Originally Posted by BrewBeemer View Post
Thats one very nice posting with everything listed as well your stand, congrats it looks like a great project.
Just trying to pass on what so many have shared with us. Thanks!

Obviously we've got some stuff to work out to finalize things but we're nearing a point where we can begin moving forward. I'm excited to see everything come together.

 
Reply With Quote
Old 11-24-2009, 05:35 PM   #6
HIM_Tattoos
Recipes 
 
Jan 2007
Green Bay, WI
Posts: 401
Liked 14 Times on 10 Posts


....and subscribed.....

 
Reply With Quote
Old 11-24-2009, 07:40 PM   #7
kladue
Senior Member
HBT_LIFETIMESUPPORTER.png
Recipes 
 
Dec 2006
Turner, Oregon, Oregon most of the time now
Posts: 2,305
Liked 53 Times on 47 Posts


Looking forward to pictures of the finished project in operation.

 
Reply With Quote
Old 11-24-2009, 08:19 PM   #8
Sawdustguy
 
Sawdustguy's Avatar
Recipes 
 
Mar 2009
Manorville, New York
Posts: 2,708
Liked 36 Times on 30 Posts


I am very much looking forward to monitoring your progress. Best of luck with the build!
__________________
Guy

 
Reply With Quote
Old 11-24-2009, 08:23 PM   #9
codemonkey
Recipes 
 
Oct 2009
NC
Posts: 10

Subbed for later, good luck!
__________________
Primary: Munich Helles Lager
Secondary: Happy Holiday Ale
Bottled: Apfelwein, Night Cap Cherry Stout, Mead

 
Reply With Quote
Old 11-28-2009, 06:33 AM   #10
mplutodh1
 
mplutodh1's Avatar
Recipes 
 
Jan 2006
Sammamish, WA
Posts: 237
Liked 7 Times on 7 Posts


Added the 3D model sketch - as noted in my edit of the first post, I'll post the Google Sketchup files at a later date as well.

Burners were ordered before Thanksgiving so should show up in the coming days - which is one of the last pieces we need before sending everything off to our welder.

Missed out on the $105 March Pumps on eBay (USAPumps) so trying to locate a few at a reasonable price as well.

 
Reply With Quote
Reply
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
The single tier build. Paraops Brew Stands 27 03-25-2009 06:44 PM
New single tier build near completion ddknight Brew Stands 11 02-27-2009 07:54 PM
Single tier HERMS reveal. SSRider Brew Stands 17 01-24-2009 04:34 AM
Single tier build photo Onescalerguy Brew Stands 14 11-25-2007 11:39 PM


Forum Jump