Home Brew Forums > Home Brewing Beer > DIY Projects > Brew Stands > Phase 1 control box and mounting arm .
Reply
 
Thread Tools
Old 10-28-2009, 11:18 AM   #1
lehr
Feedback Score: 0 reviews
Recipes 
 
Join Date: Dec 2008
Location: flushing michigan
Posts: 813
Liked 16 Times on 16 Posts

Default Phase 1 control box and mounting arm .

The start of my RIMS upgrade. Removable inner electrical panel to make it easier on my wiring guy and a swinging mount to make it compact when storing. Pat.








lehr is offline
 
Reply With Quote
Old 10-28-2009, 11:40 AM   #2
jcdillin
Feedback Score: 0 reviews
Recipes 
 
Join Date: Mar 2008
Location: Miami, FL
Posts: 709
Liked 2 Times on 2 Posts
Likes Given: 1

Default

that is very nice! I really like how you have your stand arranged.


__________________
Current Rig
4.5KW E-HLT
5.5KW E-Kettle
MasterFlex Peristaltic Primary Pump
March Secondary Pump
Therminator for Chilling

Planned
Automated Grain Drop
Automated Hop Dropper


System controlled via BrewTroller
jcdillin is offline
 
Reply With Quote
Old 10-28-2009, 11:51 AM   #3
lehr
Feedback Score: 0 reviews
Recipes 
 
Join Date: Dec 2008
Location: flushing michigan
Posts: 813
Liked 16 Times on 16 Posts

Default

Quote:
Originally Posted by jcdillin View Post
that is very nice! I really like how you have your stand arranged.
Thanks. Pat
lehr is offline
 
Reply With Quote
Old 10-28-2009, 01:01 PM   #4
Sawdustguy
Feedback Score: 1 reviews
Recipes 
 
Join Date: Mar 2009
Location: Manorville, New York
Posts: 2,781
Liked 33 Times on 28 Posts

Default

Pat,

What are you going to use as your RIMS Tube? Maybe my http://www.homebrewtalk.com/f51/rims-dummies-114997/ thread would help. You probably already know what you are going to do, so maybe looking at the thread wouldn't help so much. Just thought I would offer. Man, you do beautiful work!
__________________
Guy
Sawdustguy is offline
 
Reply With Quote
Old 10-28-2009, 01:07 PM   #5
lehr
Feedback Score: 0 reviews
Recipes 
 
Join Date: Dec 2008
Location: flushing michigan
Posts: 813
Liked 16 Times on 16 Posts

Default

Guy, I have a game plan but I also have previewed your thread.

Thanks Pat
lehr is offline
 
Reply With Quote
Old 10-28-2009, 01:41 PM   #6
JKoravos
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jul 2009
Location: Chelmsford, MA
Posts: 1,151
Liked 53 Times on 38 Posts
Likes Given: 21

Default

I see an unpolished keg in that picture, how uncouth!!!
JKoravos is offline
 
Reply With Quote
Old 10-28-2009, 03:13 PM   #7
lehr
Feedback Score: 0 reviews
Recipes 
 
Join Date: Dec 2008
Location: flushing michigan
Posts: 813
Liked 16 Times on 16 Posts

Default

Quote:
Originally Posted by JKoravos View Post
I see an unpolished keg in that picture, how uncouth!!!
Boil kettle much easier to clean when not polished...Sorry

Pat
lehr is offline
 
Reply With Quote
Old 10-28-2009, 03:39 PM   #8
sea2summit3
Feedback Score: 0 reviews
Recipes 
 
Join Date: Oct 2008
Location: Reno, NV
Posts: 164
Default

Ooooo.... pretty!
__________________
"A bar is better than a newspaper for public discussion."
-Jim Parker


Primary:-
Secondary:IPA, just "IPA"
Bottled: Applewood Smoked Porter, Windy Bridge Stout, Maple Chocolate Pumpkin Ale, Maple Pumpkin Ale, California Steam, Black Cat Porter, Irish Coffee Stout
Kegged: Blackberry Stout, Nut Brown, Sweet Cider, Apfelwein #2, IPA, SNCA Clone
sea2summit3 is offline
 
Reply With Quote
Old 11-30-2009, 10:43 AM   #9
lehr
Feedback Score: 0 reviews
Recipes 
 
Join Date: Dec 2008
Location: flushing michigan
Posts: 813
Liked 16 Times on 16 Posts

Default

Ok I have the control panel done and the heat sheilds/heat exchanger mounts done I just need to finish the wiring.






lehr is offline
 
Reply With Quote
Old 11-30-2009, 01:36 PM   #10
RonRock
Always Ready
HBT_LIFETIMESUPPORTER.png
Feedback Score: 1 reviews
 
RonRock's Avatar
Recipes 
 
Join Date: Jul 2008
Location: Underwood, Iowa
Posts: 1,324
Liked 8 Times on 8 Posts
Likes Given: 3

Default

Beautiful work.


RonRock is offline
 
Reply With Quote
Reply


Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Attenuative phase radtek General Techniques 4 04-24-2009 04:40 PM
Keggin Phase 1 Dionysos911 Bottling/Kegging 15 01-08-2009 10:45 PM
Electrical help for last phase Brewpastor Brew Stands 23 04-04-2007 02:57 PM
2 phase wiring help Brewpastor Brew Stands 12 03-01-2007 01:31 AM
just finished phase one! chainsawbrewing General Beer Discussion 5 02-25-2007 06:05 PM


Forum Jump

Newest Threads

LATEST SPONSOR DEALS