Home Brew Forums > Home Brewing Beer > DIY Projects > Brew Stands > HERMS Design
Reply
 
Thread Tools
Old 09-07-2009, 12:25 AM   #1
Drake371
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2009
Location: League CIty, TX
Posts: 19
Default HERMS Design

I am designing a HERMS system to be fully automated by a BrewTroller board with 2 MUX boards (1 for driving the solenoid valves and one for the SSR for the heating element and pump) More information about the BrewTroller can be found here.

In any case I was wondering if I could get a few of you peeps to look over my flow diagram for my HERMS system, just checking to make sure I didn't miss anything. (if the pic doesn't show up, it can be found here.




Thanks for your time,
drake


Drake371 is offline
 
Reply With Quote
Old 09-08-2009, 01:57 AM   #2
Ynaught
Feedback Score: 0 reviews
Recipes 
 
Join Date: Sep 2009
Location: SW Mo
Posts: 2
Default

The red lines to the HLT go to a heat exchanger?

I like the diagram; it's tidy and easy enough to follow.

Is this going to be on a single tier?
Ynaught is offline
 
Reply With Quote
Old 09-08-2009, 03:07 AM   #3
Drake371
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2009
Location: League CIty, TX
Posts: 19
Default

The thick red lines going to the HLT is going to a HEX. This could go either a single tier or 2 tier, the later allows a gravity feed back into the MLT and drains out the HEX coil when you transfer from MLT to BK.

Thanks for the compliment on the drawing.

drake
Drake371 is offline
 
Reply With Quote
Reply


Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
HERMS Design Suggestions? cniemira Equipment/Sanitation 5 09-01-2009 09:05 PM
Alternate HERMS design stoutaholic Equipment/Sanitation 8 08-25-2009 03:42 PM
Electric HERMs Design illin8 Brew Stands 1 05-20-2009 07:58 PM
Herms Design Help/Questions GuateBrewer Brew Stands 8 12-05-2008 12:18 PM
HERMS Design Needs Review Jared311 Brew Stands 23 05-08-2008 03:08 AM


Forum Jump

Newest Threads

LATEST SPONSOR DEALS