dood56
Active Member
Well, I think I have everything all set for my keezer. I have the collar attached, the secondary pressure gauge mounted, and shanks and taps installed. I got the temperature controller mounted and I am allowing the weather seal caulk to dry before flipping the on switch. I have measured out my beer lines to ten feet. What I hope is my last question is, how long should the gas lines be? I would assume long enough to move comfortably, but wanted to be sure. Any help would be appreciated! Thanks to all who have helped thus far. Pics to come!