OatStraw
Well-Known Member
I will start another build thread, but I am in the very early stages of making a parts list and building out how much this is actually going to cost me. The kettle conversion seems straight forward enough, but the control panel has so many different options.
I am thinking about doing the following HERMs setup.
50A Power will be available.
BCS 460 w/ no PIDs (to save money). Run the system purely from the interface.
2 Elements: 4500 for HLT 5500 for BK
2 Pumps
I want to have the ability to switch the pumps and elements on manually if something happens to the BCS.
Does anyone have a parts list or a diagram I can use. Is there a better way to do this than what I'm describing.
I am thinking about doing the following HERMs setup.
50A Power will be available.
BCS 460 w/ no PIDs (to save money). Run the system purely from the interface.
2 Elements: 4500 for HLT 5500 for BK
2 Pumps
I want to have the ability to switch the pumps and elements on manually if something happens to the BCS.
Does anyone have a parts list or a diagram I can use. Is there a better way to do this than what I'm describing.