Laouboy
Active Member
Hello Mates,
Hope everyone is having a good time drinking some good ol' home brew during the summer. My situation is like this, i purchased a dual tap tower from beverage factory a couple of months back. I installed it on my chest freezer for about 3 or 4 month. But i installed it with just screw on the top, and there was never really that grip of solidness for the set up. So what im trying to do is make it so the tower is sturdy in its place. I was wondering if anyone had any suggestions, my idea was just drill all the way through the lid and put a washer on the other end of a long screw with a nice rubber seal, but I'm hoping someone has a better solution that may seem more clean. anything would work, I tried taking a drywall bit supporter and that didnt work to well so I am open to anything
Cheers,
Laouboy
Hope everyone is having a good time drinking some good ol' home brew during the summer. My situation is like this, i purchased a dual tap tower from beverage factory a couple of months back. I installed it on my chest freezer for about 3 or 4 month. But i installed it with just screw on the top, and there was never really that grip of solidness for the set up. So what im trying to do is make it so the tower is sturdy in its place. I was wondering if anyone had any suggestions, my idea was just drill all the way through the lid and put a washer on the other end of a long screw with a nice rubber seal, but I'm hoping someone has a better solution that may seem more clean. anything would work, I tried taking a drywall bit supporter and that didnt work to well so I am open to anything
Cheers,
Laouboy