lkondolian
Member
- Joined
- Jan 7, 2009
- Messages
- 22
- Reaction score
- 0
I'm trying my first lager using Wyeast california 2112 'smack packet'. I pitched last night in my basement, which is about 50 - 55 degrees.
Packet instructions are to pitch at 70 degrees, then keep the fermenter at 70 until you see bubbles, then drop to lagering temp.
I've never heard of this 'keeping at the pitching temp until you see bubbles' strategy before. But, on the other hand, I'm a newbie, which is why I'm posting here. Does anyone else do this, or do you normally just wait longer for the primary to get rolling when using a lower-temp lager yeast?
Packet instructions are to pitch at 70 degrees, then keep the fermenter at 70 until you see bubbles, then drop to lagering temp.
I've never heard of this 'keeping at the pitching temp until you see bubbles' strategy before. But, on the other hand, I'm a newbie, which is why I'm posting here. Does anyone else do this, or do you normally just wait longer for the primary to get rolling when using a lower-temp lager yeast?