Brewing Clamper
Well-Known Member
I really want a big blingy electric setup for my brewery; however, my CFO is less than sympathetic to my cause and holds the purse strings tightly. I just received my RIMS tube parts from Murray's and now I'm ready for a controller. The easiest would be the usual Auber's PID to use my RIMS Tube with my existing MLT. Yet, I would like to eventually expand so that the whole deal is electronically controlled.
So, should I use a Brewtroller as a PID to control only the RIMS tube to my MLT and eventually expand from there?
I'm thinking I could start with a toolbox type RIMS and eventually integrate my BK which is already electric, and add pump control, etc.
Your opinions are much appreciated.
So, should I use a Brewtroller as a PID to control only the RIMS tube to my MLT and eventually expand from there?
I'm thinking I could start with a toolbox type RIMS and eventually integrate my BK which is already electric, and add pump control, etc.
Your opinions are much appreciated.