I started the planning for an electric brewery the moment that I saw Kal's build. Not one to settle with the road already walked, I started working on my own plans.

I knew that I would not be expanding from 5 gallon batches since I'm the only beer drinker. I spent some time considering my brew process and drew up requirements.

1. A stationary 5 gallon system
2. Eliminate heavy lifting as much as possible
3. Clean in place
4. Brew back to back batches
5. Repeatable process, minimize human error

Based on the requirements, I knew that I would need a basement, single tier system. 10 gallon pots, ventilation, plumbing and electrical. I also knew that PIDS would not provide the type of experience that I wanted. I started looking at arduinos, the raspberry pi, brewtroller, etc. In the end, I settled on the BCS 460 primarily due to the interface and ease of use.

Over 6-8 months, I slowly gathered the brew pots, chiller, pumps, etc. Most pieces were bought off craigslist or HBT classifieds.

305760_1991920806703_1570383600_n_zpsd76747af.jpg

321502_1929544927345_1447076_n_zps01a5b197.jpg


I also knew that I wanted to avoid Kal's weldless design while still being able to remove the elements for cleaning and replacement. Solution: Tri-clamps.

https://www.homebrewtalk.com/f16/lo...-south-chicago-336924/index2.html#post4255187

336365_3391423593398_1988941457_o_zps6f5f6457.jpg

330815_3391424953432_1130191974_o_zps6b81684f.jpg

469543_3391424113411_655705079_o_zpsc1bbe0b5.jpg


After researching ventilation and plumbing ideas, I stole Kal's solution for the exhaust fan and faucet.
1174965_10200459885608708_1548836949_n_zpsca3d8373.jpg


This is a terrible picture, but you can see the 'ferm chamber' fridge on the left. Laundry sink and faucet on the right.
1184833_10200459888728786_723421738_n_zpse18a033c.jpg


The thought of drilling holes in the Blichmann pots was terrifying, however, the greenlee step bit made easy work of it. The holes came out pretty clean with very little burr removal needed.
1098333_10200459887248749_550540713_n_zpsc4d39490.jpg


I found weldless connections on Brewers Hardware. The HERMS coil and ball valves were purchased from Stainless brewing.
1238996_10200459887728761_315315182_n_zps648c3cfa.jpg

946226_4956547520518_833320820_n_zpsfa3a8f59.jpg

313749_4409904774791_621438995_n_zps7078cde4.jpg


Temperature probes were added to the HLT and HERMS coils outputs. I need to do some testing to determine if I want the HERMS to flow from the top or bottom. For now, the output will be the top port.
1003414_4956547200510_1764994242_n_zpsfc8b8f56.jpg


After the infrastructure and pots were completed, I started to work on the control panel. The holes were drilled, then punched with a greenlee 7/8" punch. I can't stress how easy that punch made the job. Highly recommended.

Panel layout mockup:
1185054_10200459885648709_1801441033_n_zpsc76327a7.jpg


Holes punched, panel cover painted with a hammer finish:
1234393_10200459888128771_1279115253_n_zpsc72eaa25.jpg


The bottom holes were cut with hole saws and a cordless drill. That was less than ideal. In retrospect, I should have purchased/borrowed a drill press. Not a big problem, but it did skip once and scratch up the bottom of the panel.
1016115_10200459888488780_565210452_n_zpscd03f991.jpg


Completed front cover:
998677_4956548400540_201818836_n_zps51093232.jpg


Complete bottom: (Mostly completed actually. I added an ethernet jack after this picture)
1016072_4956549160559_1877686236_n_zps70d190da.jpg


I had a spare 50 amp breaker in the panel, but GFCI was needed. I opted for the spa panel as seen to the right of the control panel. The additional benefit of the spa panel is that I can remove my entire system if I ever move.
1240481_10200435671603373_516588580_n_zps4310befc.jpg


The control panel components were purchased from ebrewsupply and the wiring resembles his 50 amp product.
1149681_10200323570600918_1695740958_o_zps5e620621.jpg


It works! Sort of... Seems that my wiring isn't not quite right. I am unable to control the elements independently.
1269796_10200435491598873_331738865_o_zps4f522f4c.jpg


I did a test brew for the boil. The mash was done in a cooler due to concerns that the elements were not 100% yet.
1294342_10200435492158887_1592390370_o_zps998a0ada.jpg


Lessons learned:
1. The vortex exhaust fan works like a charm. A bit noisy when it's run at 100%.
2. My foam insulation board exhaust hood works great. No condensation at all. We'll see if that changes when winter arrives.
3. As expected 4500W elements are overkill for 5 gallon batches. I ran them at 100% when heating. 50% almost caused a boil over. At 30%, I had a nice rolling boil.

Thanks to Kal, PJ and many more here.

Cheers
 
Very cool, thanks for posting it all!

One question though: for a non-weldless build, there's a crap ton of weldless fittings there. Considering the significant sugaring that happened with the few welded fittings, in retrospect would you have reconsidered using them at all?

Cheers!
 
I had bought the weldless fittings prior to welding the tri clamps. If I ever build a second system, I will go with welded wherever possible.
 
To clarify, I love the tri clamps and would rather use them.
 
Welcome to the world of electric. Don't tell our gas freinds how fun and easy it is. They get jealous.
 
I am part of a budding brew club and am hosting Oktoberfest. I suspect there may me some time spent in the brewery. :p
 
Thanks ReuFroman. I had a lot of fun building this system. The control panel was a significant challenge for me since it was beyond my knowledge. I still have more work to do to finish the details. Control panel labels, fixing the wiring mistakes, etc.
 
Malric said:
Thanks ReuFroman. I had a lot of fun building this system. The control panel was a significant challenge for me since it was beyond my knowledge. I still have more work to do to finish the details. Control panel labels, fixing the wiring mistakes, etc.

I hear ya on the control panel. It's taking me back to college. Seems I'll be a EE in electrical Brewing before we're all done.
I sent an email to a local sign company today about putting a label on the system. He said it was a possibility. I'm thinking it will be awesome to have any font I want plus a cool looking panel.
 
Pretty Kick Ass setup Bro.... I would really like to see how you control everything via the BCS460. Shaping up to be a very sweet setup.....
 
Still no condensation issues with the cooler temps? Did you just use Aluminum tape to piece the exhaust hood together?

Ran into a small condensation issue when I had the fan at the lowest setting. I turned it up to half and haven't had any issues. Correct on the aluminum tape. I wasn't sure how effective the hood would be, but I'm really happy with it. A few people had noted condensation in the fan housing, but I haven't seen that with mine.
 
Oh, forgot to mention. I'm considering replacing the hoses and QDs with hard plumbed SS lines and 3 way valves. I've found that changing hoses takes time and is a bit of a pain.
 