Here is what I have now (brew table 2.0)
Here is what I want to do (brew table 3.0)
Im going to cut those burners apart so i have 2, and cut my aluminum top sheet in half and drop it down below for second burner to sit on. First i will weld in some supports on the lower horizontal supports for my aluminum to rest on.
Question:
Is there enough height from HLT, to the MLT to drain completely? Its 14 inches from the top of HLT to top of MLT.
Thanks. Any other suggestions?
Here is what I want to do (brew table 3.0)
Im going to cut those burners apart so i have 2, and cut my aluminum top sheet in half and drop it down below for second burner to sit on. First i will weld in some supports on the lower horizontal supports for my aluminum to rest on.
Question:
Is there enough height from HLT, to the MLT to drain completely? Its 14 inches from the top of HLT to top of MLT.
Thanks. Any other suggestions?