HDIr0n
Well-Known Member
I am looking at upgrading my weldless disaster of a stand to a Blingman Top Tier. The versatility of it has sold me on it, my only problem is my bottom draining MLT. I will still have 3 vessels that I can utilize for very large beers that need the extra sparging.
What I am envisioning is using one of the burner shelves minus the burner just installed upside down for the MLT, and having a normal PID controlled burner for the HLT/BK. Later on down the line I can buy the other burner tier to use all 3 vessels as a Brutus 10 when need be. I will use the HERMS system in my HLT/BK in a Brutus 20 setup to step mash/keep mash as I can't direct fire my MLT.
I have searched for other that have a 2 vessel (Brutus 20) on a top tier, and haven't found any. I welcome any feedback/suggestions.
Thanks,
-G
What I am envisioning is using one of the burner shelves minus the burner just installed upside down for the MLT, and having a normal PID controlled burner for the HLT/BK. Later on down the line I can buy the other burner tier to use all 3 vessels as a Brutus 10 when need be. I will use the HERMS system in my HLT/BK in a Brutus 20 setup to step mash/keep mash as I can't direct fire my MLT.
I have searched for other that have a 2 vessel (Brutus 20) on a top tier, and haven't found any. I welcome any feedback/suggestions.
Thanks,
-G