Slowly but surely I'm getting to the point of a Brutus 10 type system and I'm at the point where I need to get my stand design finalized and get the materials to weld it together.
This stand design is a little different than most as I already have three Blichmann Top-Tier burners that I'm looking to incorporate rather than replace. All three have been converted to NG and will be fired from the control panel using Honeywell standing pilot valves.
I just finished doing the majority of the wiring on my control panel tonight, and my kegs are all converted and ready to go with RTD sensors, sight glasses, recirc ports, the works. So now it's time to focus on the stand itself!
The control panel thread can be found here for those interested.
https://www.homebrewtalk.com/f235/help-me-scrutinize-my-control-panel-wiring-diagram-348487/
This is what I've come up with so far. My goal is to space the burners far enough apart should I ever decide to upgrade from the keggle setup and go with something larger. I'd love to hear if anyone sees any issues with the design!
This stand design is a little different than most as I already have three Blichmann Top-Tier burners that I'm looking to incorporate rather than replace. All three have been converted to NG and will be fired from the control panel using Honeywell standing pilot valves.
I just finished doing the majority of the wiring on my control panel tonight, and my kegs are all converted and ready to go with RTD sensors, sight glasses, recirc ports, the works. So now it's time to focus on the stand itself!
The control panel thread can be found here for those interested.
https://www.homebrewtalk.com/f235/help-me-scrutinize-my-control-panel-wiring-diagram-348487/
This is what I've come up with so far. My goal is to space the burners far enough apart should I ever decide to upgrade from the keggle setup and go with something larger. I'd love to hear if anyone sees any issues with the design!