Today was my last brew day on my Top Tier system! I'm transitioning to an electric system in my basement, so it's time to part ways with the gas system.
Please thoroughly read the description before making an offer, some of the photos contain items that are not included. I've made a very detailed list of what is included below. I will not ship the system unless you arrange for freight, in which case I'll load it on a truck but I can't palletize it. Local pickup will be easiest for everyone, as this will all easily fit in a pickup truck .
Please note that I will not part the system out unless I have solid offers for the whole system to sell at once.
I'm asking $1,400 for the whole system.
Photos:
http://dux.im/toptier
Items Included:
This system is all set up, configured, ready to run, and in excellent condition. Everything is clean and ready to rock! Bring your own method of chilling and you're good to go.
Please ask any questions at all! :fro:
Please thoroughly read the description before making an offer, some of the photos contain items that are not included. I've made a very detailed list of what is included below. I will not ship the system unless you arrange for freight, in which case I'll load it on a truck but I can't palletize it. Local pickup will be easiest for everyone, as this will all easily fit in a pickup truck .
Please note that I will not part the system out unless I have solid offers for the whole system to sell at once.
I'm asking $1,400 for the whole system.
Photos:
http://dux.im/toptier
Items Included:
- All tri-clover everything
- HLT Keggle w/ 1/2" MPT welded fitting & weldless sight glass
- Mash Keggle w/ bottom drain welded 1/2" MPT & 1/2" welded FPT with large dial thermometer w/ 8" probe, insulated with reflective insulation
- Boil Keggle w/ 1/2" MPT welded fitting & welded sight glass & 1/2" welded FPT
- Top Tier stand
- 2x Top Tier burners, hard piped to propane regulator
- 1x Top Tier Burner modified to be a stand for bottom drain mash keggle (no heat, but I have all the auxiliary parts and designed the gas header for another hook-up for a burner in this location, should you decide you need one. The mash holds temp with less than 1f loss over a 90 minute mash though, in a 50f garage. The heat is not needed.)
- Therminator bracket (bracket only, therminator not included)
- March Pump Bracket
- March 809 Pump, hard wired and switched, poly head
- 2x Blichmann natural gas conversion kits, unused (system is currently propane)
- Custom stainless folding mash screen with parallel groove design (has never stuck, extremely effective)
- Blichmann Autosparge, mounted in Mash Keggle
- Brass 1/2" full port ball valves
- Stainless tri-clover 1-1/2" butterfly valve, pull-lock type
- 2x Blichmann Brewmometers, 1 in BK, 1 in HLT
- 2x 1" tri-clover 90 elbow
- 8x tri-clover clamps
- Twist-lock extension cord with GFCI inline breaker
- 5x tri-clover X 1/2" FPT
- 5x tri-clover X 1/2" barb
- 1x Blichmann quickconnector X 1/2" barb
- 1/2" Hoses
This system is all set up, configured, ready to run, and in excellent condition. Everything is clean and ready to rock! Bring your own method of chilling and you're good to go.
Please ask any questions at all! :fro: