- Joined
- Jan 5, 2012
- Messages
- 84
- Reaction score
- 25
Ive been building a new brew stand out of my old one. Went from 3 tier to 2 tier Finished the hot water side of the plumbing tonight.
The hot water comes out and down to the line sitting on the edge of the pot. The line feeding off the side will feed the sparge arm.
Tomorrow, RIMS plumbing. The plumbing looks a bit twisted cause it was the mock up before i soldered.
The hot water comes out and down to the line sitting on the edge of the pot. The line feeding off the side will feed the sparge arm.
Tomorrow, RIMS plumbing. The plumbing looks a bit twisted cause it was the mock up before i soldered.