Elfmaze
Well-Known Member
I would like to eventually go electric with my system
currently planning a 120V gas fired BK and HLT. RIMS controlled by PID and gas assist.
My eventual goal in a year or so(when i get 240 installed to the garage) would be the ability to run back to back 10 gallon batches.
basically looking at this setup but adding the RIMS circuit. What kind of power requirements 30 or 50 amp are needed. And has anyone seen this diagram with the RIMS integrated?
My backup plan is the be able to run solo batches all electric via the PID switch, And if running back to back keep the HLT's gas burner and manually hit the sparge temp.
currently planning a 120V gas fired BK and HLT. RIMS controlled by PID and gas assist.
My eventual goal in a year or so(when i get 240 installed to the garage) would be the ability to run back to back 10 gallon batches.
basically looking at this setup but adding the RIMS circuit. What kind of power requirements 30 or 50 amp are needed. And has anyone seen this diagram with the RIMS integrated?
My backup plan is the be able to run solo batches all electric via the PID switch, And if running back to back keep the HLT's gas burner and manually hit the sparge temp.