I have the beginnings of my bar/ brewery at least organized today. This will be a long process but everything for the keezer was ordered today. I still have to add to the brew rig to get it the way I want it but I think the progress is good. Will keep posting pictures as I go.
I am planning on a coffin for the keezer at some point. For know will be picnic taps. The book shelf on the far left is for bottle conditioning and empty storage shelf next to it holds my small wares (hydrometer, thermometers, siphon, etc) and will end up with a mini fridge on top. Then the keezer, then on the right of that I have an extra Jaegermeister machine from my bar (commercial I own a restaurant and bar). It is an old computer desk so I will have a pull out laptop shelf.
Then the brew rig. I am going to extend the mlt shelf to get a better flow from the hlt and so I don't have to climb up that high.
I think the picture attached if not I will try again. Also the bud light sign is the only neon I could pull from the bar! Don't give me crap about BMC! Haha
I am planning on a coffin for the keezer at some point. For know will be picnic taps. The book shelf on the far left is for bottle conditioning and empty storage shelf next to it holds my small wares (hydrometer, thermometers, siphon, etc) and will end up with a mini fridge on top. Then the keezer, then on the right of that I have an extra Jaegermeister machine from my bar (commercial I own a restaurant and bar). It is an old computer desk so I will have a pull out laptop shelf.
Then the brew rig. I am going to extend the mlt shelf to get a better flow from the hlt and so I don't have to climb up that high.
I think the picture attached if not I will try again. Also the bud light sign is the only neon I could pull from the bar! Don't give me crap about BMC! Haha