Concho
Well-Known Member
- Joined
- Sep 30, 2012
- Messages
- 57
- Reaction score
- 4
I'm building an electric HLT for my all grain set up and it's making me feel really stupid, not a new feeling to me when dealing with electrical stuff. This is what I got so far : 1 big ass SS Pot, Auber PID, 40amp SSR with heat sink, 1/2" thermocoupler for PID, 2000 watt element, SS Lock washer, and several bulkheads (valve, sight glass and thermo, whirlpool).
I need a project box, pump for whirlpool and what else am I missing? What size project box (I want one big enough to convert to full electric set up later)? I'm wanting a fairly simple control panel with the pid, emergency off, and pump switch. Is there anything else I need? anything else I need
I need a project box, pump for whirlpool and what else am I missing? What size project box (I want one big enough to convert to full electric set up later)? I'm wanting a fairly simple control panel with the pid, emergency off, and pump switch. Is there anything else I need? anything else I need