smoothlarryhughes

Gift Premium Subscription To smoothlarryhughes

Join Date:

11-10-2010

Last Activity:

10-20-2014 9:53 AM

1 Likes on 1 Posts 

    ABOUT ME

  • Single
  • Collegeville
  • PA

LATEST ACTIVITY

  • Posted in thread: Triclamp heater element design on 08-17-2013 at 02:01 AM
    how are you covering the connections when using this? seems easy to install onto the kettle,
    but the video doesn't show how to cover the connections.

  • Posted in thread: 1" couplers or nuts? on 08-07-2013 at 01:11 AM
    How about a tri clover fitting ? This setup is a dream for e kettles . Simply unclamp it to
    take the element out. Can also end cap it and use on a regular burner. Your not married to
    electric only. D...

  • Posted in thread: 1" couplers or nuts? on 08-04-2013 at 11:52 PM
    The benefit (for me) of the coupler is that is is what I used to secure my weatherproof box. I
    dimpled the 1" coupler through a stainless blank, then dimpled through my kettle wall. Silver
    soldered ev...

  • Posted in thread: Electric Control Panel (2nd time planning) on 07-09-2013 at 01:23 AM
    I had to send the probes back for the RTD's because I ordered the wrong ones...I should be
    getting the probes with the weldless fitting sometime next week.

  • Posted in thread: Electric Control Panel (2nd time planning) on 07-09-2013 at 01:22 AM

  • Posted in thread: Electric Control Panel (2nd time planning) on 07-09-2013 at 12:50 AM
    Parts are starting to roll in:

  • Posted in thread: RTD Probes from Auberins.com on 07-08-2013 at 08:44 PM
    I was able to ship just the probes back to Auber, and they are sending me the weldless ones.

  • Posted in thread: RTD Probes from Auberins.com on 07-08-2013 at 01:20 AM
    So...I ordered 2 of these probes to mount into my HLT and MLT for an electric setup, but it
    doesn't come with anything to mount to a kettle. And the threading is tapered. Will this work?
    should I hav...

  • Posted in thread: Electric Control Panel (2nd time planning) on 07-02-2013 at 02:46 AM
    Total - ~923.00

  • Posted in thread: Electric Control Panel (2nd time planning) on 07-02-2013 at 02:45 AM
    Order is in....I ordered most of my parts from ebrewsupply...ItemSkuQtySubtotalMushroom Button,
    NO Contact MUSHROOM42NO1$5.00 220v 40a, 110v Coil, Contactor 40a_contactor3$40.50 2-Way, 1 NO
    Contact, S...

0 COMMENTS
POST A COMMENT