I will have multi. 55 gallon barrels ferementing for 30 day periods of time. Plus I will have 3 79 gallon stainless steel fermenters (right now I only have one).
The place I have to put this is a quasine hut but only in a smaller part of the building. The temps. go extreme like the weather. It has a smooth concrete floor.
So I was thinking a 10x10 room with a roof. 2x4's with foam insulation ( I heard it gets a R-30 rating) and something like this
Frigidaire 9,000 BTU Heat and Cool Air Conditioner 220 Volts 50HZ, 110220Volts.com,
for temp controls. I really want this to be automated. I want to be able to turn it on and know for 6 months nothing is going to happen to the temps. of the room to insure a constant ferment temp. I am not going to make a plan for power outages. I do have generaters for emergency power but would prefer not to use them.


Cold_Steel is offline Reply With Quote
Old 05-25-2009, 01:39 AM   #2
Senior Member
Recipes 
 
Join Date: Apr 2009
Posts: 638
Default

wow 45 views and no response. Thats awesome. I feel like I am talking to my wife.
Cold_Steel is offline Reply With Quote
Old 05-25-2009, 01:46 AM   #3
Senior Member
 
ChshreCat's Avatar
Recipes 
 
Join Date: Aug 2008
Location: Camano Island, Washington
Posts: 9,651
Default

Well, you did post at 7am on a sunday morning of a three-day holiday weekend (in the states at least).

And if you do a search, or check the stickies at the top of the DIY forum, you'd find this http://www.homebrewtalk.com/f51/my-latest-project-walk-cooler-11440/ among other things. Hope that helps.
__________________
"Science + beer = good!"
-Adam Savage
ChshreCat is offline Reply With Quote
Old 05-25-2009, 02:13 AM   #4
Senior Member
 
Dwain's Avatar
Recipes 
 
Join Date: Feb 2009
Location: Hill Country, TX
Posts: 1,136
Default

A couple of things. First, a 10X10 room is not going to give you room for a whole lot of 55 gal bbls. plus the 79 gal. fermenters. Especially if you have to move them with a hand truck. But I'm sure you've done your home work on that. Second, does this have to be installed by a professional? I mean, the refrigerant lines have to be run from the inside unit to the compressor. And does this matter. Do you have to switch it from heating to cooling manually or just enter a set point. Finally, that looks like a pretty good price if it is all auto and you don't have to switch it. The window units I've been looking at are a little cheaper, but you have to switch them manually. Let us know what you decide. Luck - Dwain

Last edited by Dwain; 05-25-2009 at 02:15 AM. Reason: addition
Dwain is offline Reply With Quote
Old 05-25-2009, 02:35 AM   #5
Senior Member
Recipes 
 
Join Date: Apr 2009
Posts: 638
Default

No it doesnt matter if a pro does it or not. however I will say a pro is at hand as far as construction goes. I dont know what you mean by "the refrigerant lines have to be run from the inside uit to the compressor"
I want a heat and cooling unit in one. the unit I highled I believe to do just that. thanks for your help dwain
Cold_Steel is offline Reply With Quote
Old 05-25-2009, 04:03 AM   #6
Senior Member
 
Dwain's Avatar
Recipes 
 
Join Date: Feb 2009
Location: Hill Country, TX
Posts: 1,136
Default

Crystalcabot,
I just realized. I miss spelled "unit" (uit) in the first post. Looking at the bottom of the page you linked to, it shows the outside unit, then the refrigerant lines go to the inside unit. My guess is that after the outside and inside units are installed, the lines will need to be sweated together, a vacuum pulled and the unit charged with refrigerant. I'm not sure, I'm just guessing. That's what I meant by a professional to install. If I'm still not getting my meaning across, let me know and I'll try to explain better. Luck - Dwain
Dwain is offline Reply With Quote
Old 05-25-2009, 04:41 AM   #7
Cycling + Beer
Recipes 
 
Join Date: Aug 2008
Location: Santa Maria, CA
Posts: 59
Default

Quote:
Originally Posted by crystalcabot View Post
wow 45 views and no response. Thats awesome. I feel like I am talking to my wife.
My jaw was pretty close to the floor when I read about your batch sizes. Maybe some of us just brew 5 or 10 gallons at a time. 55-79 gallons is a pretty sizable. I thought many commercial operations run glycol cooled systems to each beer an have it's desired temp for that yeast.
bikefoolery is offline Reply With Quote
Old 05-25-2009, 11:23 AM   #8
Senior Member
 
rico567's Avatar
Recipes 
 
Join Date: Apr 2008
Location: Central IL
Posts: 2,644
Default

+1 Most people on this forum, from what I've read, only do 5-10 gallon batches (I've never done more than 5, and I ferment in a plastic bucket). I am pretty much aware that the technical issues of brewing aren't necessarily the same as you scale up the process, i.e., cooling a fermenting batch becomes a far bigger problem, due to the decrease in surface area of the container in proportion to the volume of a liquid undergoing an exothermic reaction. I'm thinking you may want consultation from a more professional source.......
__________________
“Malt does more than Milton can / To justify God’s ways to man”

-A. E. Housman (1859–1936). A Shropshire Lad , 1896.
rico567 is offline Reply With Quote
Old 05-25-2009, 12:46 PM   #9
Senior Member
Recipes 
 
Join Date: Apr 2009
Posts: 638
Default

Quote:
Originally Posted by Dwain View Post
Crystalcabot,
I just realized. I miss spelled "unit" (uit) in the first post. Looking at the bottom of the page you linked to, it shows the outside unit, then the refrigerant lines go to the inside unit. My guess is that after the outside and inside units are installed, the lines will need to be sweated together, a vacuum pulled and the unit charged with refrigerant. I'm not sure, I'm just guessing. That's what I meant by a professional to install. If I'm still not getting my meaning across, let me know and I'll try to explain better. Luck - Dwain
Ok gotcha now I see what you mean. I was thinking about the framing and such.
Cold_Steel is offline Reply With Quote
Old 05-25-2009, 12:48 PM   #10
Senior Member
Recipes 
 
Join Date: Apr 2009
Posts: 638
Default

Quote:
Originally Posted by rico567 View Post
+1 Most people on this forum, from what I've read, only do 5-10 gallon batches (I've never done more than 5, and I ferment in a plastic bucket). I am pretty much aware that the technical issues of brewing aren't necessarily the same as you scale up the process, i.e., cooling a fermenting batch becomes a far bigger problem, due to the decrease in surface area of the container in proportion to the volume of a liquid undergoing an exothermic reaction. I'm thinking you may want consultation from a more professional source.......
Nawww I love it here.
I am just doing mult batches.


Cold_Steel is offline Reply With Quote
Reply
Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Web Controlled All-in-One Temp Controller physfarm DIY Projects 50 12-13-2009 02:44 PM
First BCS temp controlled fermentation cyberbackpacker Equipment/Sanitation 3 10-31-2009 07:19 PM
1st Temp-Controlled Brew - Question... Grizzlybrew Fermentation & Yeast 2 09-17-2009 04:23 AM
Ideal Ambient Temp for Ales in Temp Controlled Environment? xinunix Beginners Beer Brewing Forum 4 05-12-2009 03:58 AM
Temp of room and fermentation Hunter Beginners Beer Brewing Forum 4 06-29-2006 12:06 AM





Contact Us - Top - Privacy - All times are GMT. The time now is 10:20 AM.
Copyright © Group Builder, Inc - All Rights Reserved
Craft Beer & Brewery Forum