Got the fittings fig welded today at work. Still have to clean it up. But I had to side it in and see how they lined up. Got the fittings welded in the keg too.
I travel for work so much, that I haven't brewed any beer for a while. I finally dusted this off and I'm going to try my first all grain batch. Will update with pics. Still have to order a rims tube and build a panel.
I ordered a stout tanks rims tube on Monday. Can't wait to get it. I plan on starting the electric panel soon. I have 2 ssr's getting contractor's today. Need to order the aubern pid temp controllers.