Default Phase 2 brewery boiler testing

Have finally beat PID code into submission and hit target operation for strike water heating @ .5GPM, here is a chart Picasa Web Albums - Kevin - Boiler Test, here is the boiler Picasa Web Albums - Kevin - New Boiler an.... Next goal is the boiler water and wort flow control loops then steam/wort mixer temperature control. After loop tuning is finished the final testing with malt and sequence control, then test run with full size mash to see if all the design features work and target gravity is reached. The design goal with the boiler is to heat strike water, sparge water, and make steam for step mashing. With the flash boiler it should be possible to dough in with less than 10 minutes needed from cold start to finish, and make mash temperature steps of up to 50 degrees in about 10-12 minutes.

__________________

kladue is offline
 
Reply With Quote Quick reply to this message
Reply



Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Phase 2 brewery build progress shots kladue DIY Projects 207 05-24-2011 04:37 AM
Attenuative phase radtek General Techniques 4 04-24-2009 04:40 PM
PH testing and Starch Testing. Orfy All Grain & Partial Mash Brewing 18 03-28-2009 05:28 PM
Phase 2 brewery construction photo kladue Equipment/Sanitation 35 07-24-2008 05:34 PM
Electrical help for last phase Brewpastor DIY Projects 23 04-04-2007 02:57 PM