Ss Brewing Technologies Giveaway!

Home Brew Forums > Home Brewing Beer > DIY Projects > New Brewery Build is Complete
Reply
 
LinkBack Thread Tools
Old 02-24-2011, 06:53 PM   #21
jermanimal
Feedback Score: 0 reviews
Recipes 
 
Join Date: Dec 2009
Location: Des Moines, IA
Posts: 75
Liked 1 Times on 1 Posts

Default

Quote:
Originally Posted by robbiex0r

Do you control the flame with those red-handled valves at all? or do you never run more than one burner at once? Trying to figure out how to plumb my stand. I think I'll want to do at least 2 burners at once, if I want to do some decoctions or turbid mashing.
I can get a little control, but not much. Run top two at same level and warm up sparge at same time as strike water in mash tun. After start sparge, don't use mash burner and only heat wort in kettle and maintain sparge temp. Not ideal, if I was going to add more control with needle valve after top mash ball valve.
__________________
jermanimal is offline
 
Reply With Quote Quick reply to this message
Old 08-31-2011, 08:05 AM   #22
lovethepirk
Feedback Score: 0 reviews
Recipes 
 
Join Date: Aug 2011
Location: Naples, FL
Posts: 1
Default

Where did you get the steel?

Thank.

__________________
lovethepirk is offline
 
Reply With Quote Quick reply to this message
Old 09-02-2011, 04:18 PM   #23
jermanimal
Feedback Score: 0 reviews
Recipes 
 
Join Date: Dec 2009
Location: Des Moines, IA
Posts: 75
Liked 1 Times on 1 Posts

Default

Local steel shop, just look in Yellow pages and find a local shop. Not worth it to order, steel is heavy.

__________________
jermanimal is offline
 
Reply With Quote Quick reply to this message
Reply



Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
My Keezer build.. finally complete metaltim DIY Projects 1 02-21-2011 06:19 PM
Brutusesque 20 build almost complete p4ck37p1mp DIY Projects 33 04-16-2010 04:30 PM
Brew stand build - almost complete! Brewme DIY Projects 2 06-10-2009 03:01 AM