Electric Brewing Supply 30A BCS Giveaway - Last Weekend to Enter!


Home Brew Forums > Home Brewing Beer > DIY Projects > New Brewery Build
Reply
 
LinkBack Thread Tools
Old 06-03-2010, 08:10 PM   #21
P8ten
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jan 2008
Posts: 29
Default

This is going to be sweet! Subscribed

__________________

When I have a beer I feel like a new man, then that man wants a beer.

P8ten is offline
 
Reply With Quote Quick reply to this message
Old 06-07-2010, 03:21 AM   #22
rabeb25
Feedback Score: 1 reviews
Recipes 
 
Join Date: Jan 2009
Location: Albertville MN
Posts: 317
Liked 19 Times on 14 Posts
Likes Given: 3

Default

Well Another week has passed with not much to really talk about. What I did this week...

Started framing the front wall. The kettles and hood will be recessed and come out flush to the wall in front.



I started framing on my mini walk in, I will keep the ac unit on top and duct it down into the ceiling of the cooler. It will have a few shelves in it and should hold about 18 cornies if full.


Other than that just put some cans up and wired for the in ceiling speakers.



Hopefully next weekend you will see some major headway, now that I have all the supplies for finishing the room, and 95% of the brew system.

Bryan

__________________
rabeb25 is offline
 
Reply With Quote Quick reply to this message
Old 06-07-2010, 02:17 PM   #23
P-Lay
Feedback Score: 0 reviews
Recipes 
 
Join Date: Mar 2009
Location: Deltona, FL
Posts: 148
Default

I have to say I'm really looking forward to seeing this progress. Looks like a great space for everything and well thought out. Good luck and keep the pics coming.

__________________

Cheers!
P

Quote:
Originally Posted by bad coffee View Post
Why kill when you can OVERKILL!
Quote:
Originally Posted by TheManes View Post
Have you considered drinking more?
P-Lay is offline
 
Reply With Quote Quick reply to this message
Old 06-09-2010, 03:35 AM   #24
rabeb25
Feedback Score: 1 reviews
Recipes 
 
Join Date: Jan 2009
Location: Albertville MN
Posts: 317
Liked 19 Times on 14 Posts
Likes Given: 3

Default

Well, I had some time today. I got 99% of the framing done(just have some sheet rock backers to put in). I worked on the cooler and got the "manifold" worked out, got it insulated, and got the temp controller hooked up.

Franken window ac:


Ac manifold, and ducting:


Insulation:


At the end of the day..I did a test fit




Bryan

__________________
rabeb25 is offline
 
Reply With Quote Quick reply to this message
Old 06-09-2010, 06:14 PM   #25
fatduck
Feedback Score: 0 reviews
Recipes 
 
Join Date: Oct 2008
Location: Minneapolis
Posts: 35
Default

This is truly awesome man, great job!

Id love to come out and see it when you're done.

__________________
fatduck is offline
 
Reply With Quote Quick reply to this message
Old 06-09-2010, 11:54 PM   #26
japhroaig
Feedback Score: 0 reviews
Recipes 
 
Join Date: Apr 2010
Location: Eugene Oregon
Posts: 365
Liked 2 Times on 2 Posts

Default

In the very first picture in the upper right hand corner, is that an EE High Capacity? If so, wise choice

__________________
Blog http://cheeseaday.blogspot.com
Conicals House Trippel, Wee Heavy
Kegs Juggling Geese Ale, Effed Up Mild, Fils Wheat Ale

Team Nottingham Yeast!
japhroaig is offline
 
Reply With Quote Quick reply to this message
Old 06-10-2010, 12:09 AM   #27
pilotdane
Feedback Score: 0 reviews
Recipes 
 
Join Date: May 2009
Location: Roxboro, NC
Posts: 330
Liked 2 Times on 2 Posts

Default

Quote:
Originally Posted by rabeb25 View Post
Ac manifold, and ducting:

Bryan
I thought this was a NASA photo of a shuttle engine!
__________________
pilotdane is offline
 
Reply With Quote Quick reply to this message
Old 06-10-2010, 12:26 AM   #28
RonRock
Always Ready
HBT_LIFETIMESUPPORTER.png
Feedback Score: 1 reviews
 
RonRock's Avatar
Recipes 
 
Join Date: Jul 2008
Location: Underwood, Iowa
Posts: 1,317
Liked 7 Times on 7 Posts
Likes Given: 2

Default

Quote:
Originally Posted by rabeb25 View Post
@jfkriege and mmurray..Got the valves from a group buy..I *may* have some extras if you are interested...Here are the specs

@Maltose I am using a 40 plate duda diesel plate chiller.

I could use some valves. Any available?
__________________
My Brutus Build

http://www.lonewolfbrewery.com/
RonRock is offline
 
Reply With Quote Quick reply to this message
Old 06-10-2010, 02:19 AM   #29
rabeb25
Feedback Score: 1 reviews
Recipes 
 
Join Date: Jan 2009
Location: Albertville MN
Posts: 317
Liked 19 Times on 14 Posts
Likes Given: 3

Default

Quote:
Originally Posted by RonRock View Post
I could use some valves. Any available?
Sorry my pm box was full..I don't know yet. I have not received my kettles yet (been 4 weeks) so I have not been able to do the setup.

Bryan
__________________
rabeb25 is offline
 
Reply With Quote Quick reply to this message
Old 06-13-2010, 04:00 AM   #30
rabeb25
Feedback Score: 1 reviews
Recipes 
 
Join Date: Jan 2009
Location: Albertville MN
Posts: 317
Liked 19 Times on 14 Posts
Likes Given: 3

Default

Quote:
Originally Posted by fatduck View Post
This is truly awesome man, great job!

Id love to come out and see it when you're done.
Sure anytime!
__________________
rabeb25 is offline
 
Reply With Quote Quick reply to this message
Reply



Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
New brewery Build thewurzel DIY Projects 19 07-30-2013 06:53 PM
Basement brewery build. crawford DIY Projects 27 02-10-2010 05:29 PM
NEED HELP! I want to build a brewery dregus Equipment/Sanitation 2 08-10-2009 01:11 PM