New Giveaway - Wort Monster Conical Fermenter!

Home Brew Forums > Home Brewing Beer > DIY Projects > MyHERMS (automated) build




Reply
 
LinkBack Thread Tools Display Modes
Old 05-01-2012, 02:31 PM   #11
drac0
Feedback Score: 0 reviews
Recipes 
 
Join Date: Mar 2010
Location: Pensacola, Florida
Posts: 145
Liked 3 Times on 2 Posts
Likes Given: 10

Default

Thanks for the link, I've been looking all over for reasonably priced automatic valves.



__________________
Dragon Scale Brewery
drac0 is offline
 
Reply With Quote Quick reply to this message
Old 05-01-2012, 11:07 PM   #12
A4J
HBT_LIFETIMESUPPORTER.png
Feedback Score: 1 reviews
 
A4J's Avatar
Recipes 
 
Join Date: Mar 2008
Location: the Desert, CA
Posts: 1,346
Liked 25 Times on 23 Posts
Likes Given: 15

Default

great build!

do you have a wiring diagram?



__________________
Primary 1: pale ale
Primary 2: blondie


My mid-century modern keezer build thread.
A4J is offline
 
Reply With Quote Quick reply to this message
Old 05-01-2012, 11:47 PM   #13
goingmad
Feedback Score: 0 reviews
Recipes 
 
Join Date: Nov 2011
Location: milan, Italy
Posts: 160
Liked 7 Times on 5 Posts
Likes Given: 4

Default

Quote:
Originally Posted by A4J View Post
great build!

do you have a wiring diagram?
I've found great sources especially in this two systems

Black Heart Brewery
Black Dog Brewery

And you can find useful also this

I'm going with LP gas burners, so I don't have to deal with the heater electric part.

cheers

gm

[off topic] Just seen your keezer: AWESOME!!!
__________________

My toys: HERMS system Fermentation Chamber Control Panel

goingmad is offline
 
Reply With Quote Quick reply to this message
Old 05-02-2012, 11:14 PM   #14
goingmad
Feedback Score: 0 reviews
Recipes 
 
Join Date: Nov 2011
Location: milan, Italy
Posts: 160
Liked 7 Times on 5 Posts
Likes Given: 4

Default

Little step today, bought the enclosure for the bubbler volume sensors and aquarium pumps. Cheap, but everything seems to fit properly inside.



Now, for the bubbler system, I have just to wire the sensors to the bt board connectors and to cut the tube in the right lenght for reaching the kettles from the enclosure. This is to be done when the build is almost at the final steps.

__________________

My toys: HERMS system Fermentation Chamber Control Panel

goingmad is offline
 
Reply With Quote Quick reply to this message
Old 05-04-2012, 09:39 PM   #15
goingmad
Feedback Score: 0 reviews
Recipes 
 
Join Date: Nov 2011
Location: milan, Italy
Posts: 160
Liked 7 Times on 5 Posts
Likes Given: 4

Default

Another day has almost gone with a further small step done.

Made the holes for the xlr panel mount connectors in the enclosure, in which the bt boards, sub-boards, power supply and airport express (giving wifi to bt). Tomorrow I'd like to place the switches as well.





Bought the hose couplings for the honeywell valves as well



These are the xlr cables waiting for the valves and the pumps



And this is what I've received today, since I'm planning to brew a wit beer as soon as I could. I've already have a lot of pilsner grain waiting to join my brewing day!

__________________

My toys: HERMS system Fermentation Chamber Control Panel

goingmad is offline
 
Reply With Quote Quick reply to this message
Old 05-05-2012, 02:55 PM   #16
Carter05
Feedback Score: 0 reviews
Recipes 
 
Join Date: May 2008
Location: , Nebraska
Posts: 24
Liked 1 Times on 1 Posts

Default

Nice system so far! I think the mash tun is my favorite part.

A suggestion for you though. Remove the ball valves you have on the input side of your pumps. They are designed to be restricted on the output. You can actually ruin them if you restrict on them input side.

__________________
Carter05 is offline
 
Reply With Quote Quick reply to this message
Old 05-05-2012, 03:19 PM   #17
goingmad
Feedback Score: 0 reviews
Recipes 
 
Join Date: Nov 2011
Location: milan, Italy
Posts: 160
Liked 7 Times on 5 Posts
Likes Given: 4

Default

Thanks Carter,

you are right, actually I have the ball valves on the input size of the pumps since I've not already bought F-F 1/2" couplings, using the valve instead. They're always 100% open!

__________________

My toys: HERMS system Fermentation Chamber Control Panel

goingmad is offline
 
Reply With Quote Quick reply to this message
Old 05-05-2012, 03:22 PM   #18
Squeeky
Feedback Score: 0 reviews
Recipes 
 
Join Date: Sep 2005
Location: Dayton, Ohio
Posts: 509
Liked 15 Times on 14 Posts
Likes Given: 3

Default

Although I agree with your above statement about the valves on the input side (when using manual valves), there is a major advantage with automation. You can design the program to not turn the pump unless one of the input valves are open.

Keep up the great work, goingmad! I have my BT 3.3 on the way.

__________________
Squeeky is offline
 
Reply With Quote Quick reply to this message
Old 05-05-2012, 03:39 PM   #19
goingmad
Feedback Score: 0 reviews
Recipes 
 
Join Date: Nov 2011
Location: milan, Italy
Posts: 160
Liked 7 Times on 5 Posts
Likes Given: 4

Default

And also you are right Squeeky, but I'd feel more safe to have a manual valve backup for everything that could go wrong, while brewing, with the electric system. I'm going to have manual ball valves for every output from the kettles as well. For the same reason even if with electric honeywell gas valves, also there I'll have manual gas valve as a safety backup. Never managed a system like this, quite complex for my previous experience, so I feel better with some additional "emergency exits".

As for the bretroller, the recent updates, especially with the web gui, place it a way better than before. I really can't wait to brew with it!!! Good luck with your build too!

__________________

My toys: HERMS system Fermentation Chamber Control Panel

goingmad is offline
 
Reply With Quote Quick reply to this message
Old 05-05-2012, 04:24 PM   #20
Bigscience
Feedback Score: 0 reviews
Recipes 
 
Join Date: Sep 2009
Location: Woodinville, WA
Posts: 592
Liked 25 Times on 24 Posts
Likes Given: 4

Default

What is the material on top of your mill hopper? I'm looking for some edge banding to protect from sharp edges like that. Nice build too.



__________________

First they came for my Four Loko and I said nothing, then they came for my Double Imperial Espresso Stout.

Bigscience is offline
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options
Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
Automated burner help Cantaloupe DIY Projects 16 04-04-2013 10:13 PM
MyHerms project goingmad DIY Projects 18 01-25-2013 08:55 PM
Automated E-HERMS build Maltose DIY Projects 23 04-05-2012 12:02 AM
My Automated E-Herms Build (LabJack) cruelkix DIY Projects 46 05-17-2010 03:25 AM
Automated Decoction? TimWeber DIY Projects 16 01-07-2010 09:05 PM