First off we have the HLT
I decided to go bottom drain on everything but the boil kettle. I think it makes it look nice and keeps me from having to make pick up tubes for everything.
Looking down into the HLT, here the coil is missing but you can see the 1650W water heater element.
Here is the coil, it's installed now I will have to take a couple more pictures. It's 30ft of 1/2" OD copper water tubing.
Here is the element connection, I still have to build a cover for it.
And here are the QD connections for the HEX coil.
So that is pretty much it for the HLT, I still have to drill the hole to mount the temp probe, but i'm waiting to finish up my probe builds for the BrewTroller for that.