Home Brew Forums > Home Brewing Beer > DIY Projects > My brew-stand




Reply
 
LinkBack Thread Tools Display Modes
Old 05-22-2012, 03:25 AM   #31
Senior Member
Feedback Score: 0 reviews
 
Huaco's Avatar
Recipes 
 
Join Date: Dec 2011
Location: Lipan, Tx
Posts: 1,065
Liked 74 Times on 48 Posts
Likes Given: 16

Default

I spent about an hour and a half this evening and went with an idea I had to make a false bottom out of the keg bottom I cut out of one of my keggles. As soon as my phone decides it is done backing up I will post a picture...


Huaco is offline
 
Reply With Quote Quick reply to this message
Old 05-22-2012, 04:24 AM   #32
Senior Member
Feedback Score: 0 reviews
 
Huaco's Avatar
Recipes 
 
Join Date: Dec 2011
Location: Lipan, Tx
Posts: 1,065
Liked 74 Times on 48 Posts
Likes Given: 16

Default

The FB is 12-3/4" diameter. I laid out 1/16" slots radially. 66 slots all total. I put it in the bottom of the keg and pushed down in the center. NO BUDGE AT ALL! I think this thing will handle quite a large mash...










Huaco is offline
 
Reply With Quote Quick reply to this message
Old 05-23-2012, 03:40 PM   #33
Senior Member
Feedback Score: 0 reviews
 
Huaco's Avatar
Recipes 
 
Join Date: Dec 2011
Location: Lipan, Tx
Posts: 1,065
Liked 74 Times on 48 Posts
Likes Given: 16

Default

I calculated my open space. On the 12-3/4" diameter FB, I have 13^2 in open area. Surely that is enough open area to be useful on this scale...

Also...
My control panel kit came in yesterday from Kal (actually Spike Innovations). Boy-howdy. It is a bit intimidating to open it all up and see it PACKED with components that all have to be wired together.
This is a water-tight electrical enclosure 16"Wx20"Hx8"D.

Here is a tentative layout. I have a buddy that is going to Water Jet the panel door for me... once I get it laid out and give him the DXF file...










Huaco is offline
 
Reply With Quote Quick reply to this message
Old 05-23-2012, 05:22 PM   #34
Feedback Score: 0 reviews
 
BigLuke's Avatar
Recipes 
 
Join Date: Feb 2011
Location: Chattanooga, TN
Posts: 80
Liked 2 Times on 2 Posts
Likes Given: 3

Default

That is awesome! Subbed. Please keep the pics coming, especially the build of Kal's controll panel kit.
BigLuke is offline
 
Reply With Quote Quick reply to this message
Old 05-31-2012, 03:36 AM   #35
Senior Member
Feedback Score: 0 reviews
 
Huaco's Avatar
Recipes 
 
Join Date: Dec 2011
Location: Lipan, Tx
Posts: 1,065
Liked 74 Times on 48 Posts
Likes Given: 16

Default

Finished assembling the temperature sensor cables. Built as outlined on Kal's site. I reinforced them with stainless steel stranded wire and overlaid them with two layers of the expandable plastic mesh. shrink wrapped each end and put on an XLR3 connector to finish it all off. Soldering is interesting to learn. I checked continuity all along and actually found my soldered joints to be good.


Huaco is offline
 
Reply With Quote Quick reply to this message
Old 06-01-2012, 06:13 PM   #36
Senior Member
Feedback Score: 0 reviews
 
Huaco's Avatar
Recipes 
 
Join Date: Dec 2011
Location: Lipan, Tx
Posts: 1,065
Liked 74 Times on 48 Posts
Likes Given: 16

Default

Just got a picture from my buddy that water-jet cut my panel. CAN NOT WAIT TO GET THIS BACK!

The only change I made from my dimensioned drawing is that I moved the temp probe XLR inputs back to the bottom of the enclosure.




Huaco is offline
 
Reply With Quote Quick reply to this message
Old 06-01-2012, 10:07 PM   #37
Feedback Score: 0 reviews
Recipes 
 
Join Date: Oct 2011
Location: Paris, Ontario
Posts: 210
Liked 4 Times on 4 Posts
Likes Given: 3

Default

I did something similar for my false bottom.

I ended up added a few hundred .096 dia holes to it as well. After one or two stuck mashes the time at the drill press was well spent..
aquenne is offline
 
Reply With Quote Quick reply to this message
Old 06-02-2012, 02:43 AM   #38
Senior Member
Feedback Score: 0 reviews
 
Huaco's Avatar
Recipes 
 
Join Date: Dec 2011
Location: Lipan, Tx
Posts: 1,065
Liked 74 Times on 48 Posts
Likes Given: 16

Default

Quote:
Originally Posted by aquenne View Post
I did something similar for my false bottom.

I ended up added a few hundred .096 dia holes to it as well. After one or two stuck mashes the time at the drill press was well spent..
Can you please post a picture of what you did? I would like to see it.
Huaco is offline
 
Reply With Quote Quick reply to this message
Old 06-03-2012, 02:46 AM   #39
Senior Member
Feedback Score: 0 reviews
 
Huaco's Avatar
Recipes 
 
Join Date: Dec 2011
Location: Lipan, Tx
Posts: 1,065
Liked 74 Times on 48 Posts
Likes Given: 16

Default

Spent some time on Dad's drill press with my hole saws this afternoon. I got all the openings for the electrical recepticals cut. I have (3) temp sensors, (2) heating elements, (2) pumps, and (1) main power in at 240V and 50 Amps.


Huaco is offline
 
Reply With Quote Quick reply to this message
Old 06-05-2012, 02:58 AM   #40
Senior Member
Feedback Score: 0 reviews
 
Huaco's Avatar
Recipes 
 
Join Date: Dec 2011
Location: Lipan, Tx
Posts: 1,065
Liked 74 Times on 48 Posts
Likes Given: 16

Default

The panel door arrived today! I installed all the panel components as a test fit mock-up. It all worked very well except the volt and amp meters. I ended up having to knock off some material with just a few minutes of file work.

I also preped, primed and painted the panel door. I am not sure what happened, but in the middle of the panel the paint will not get a "Sheen" like the remainder of the panel. I noticed a little difference in the way the primer looked in that spot. I wonder if I had some primer come up the feed tube that was not fully mixed or something and laid down more solids there... I will wait 'till tomorrow to see what it looks like and if it is not better I will sand the door and reapply.

Also, I got my 2" TriClamp to 1/2" NPTF adapters in the mail today. I have 3" pipe nipples on order too.






Huaco is offline
 
Reply With Quote Quick reply to this message
Reply

Quick Reply
Message:
Options
Thread Tools
Display Modes


Similar Threads
Thread Thread Starter Forum Replies Last Post
My Wood Brew-traption (brew stand) fxdrider DIY Projects 17 11-18-2012 10:17 PM
Fish Tank Stand for Brew Stand aredling DIY Projects 4 02-26-2012 08:17 PM
Brew Stand build (Mini Brew Stand) Espi DIY Projects 20 05-07-2011 01:06 AM
Brew stand to brew 2 batches at the same time?? Mike3701 DIY Projects 4 02-20-2011 03:09 AM
Need some help with my Brew Stand... Please. ThePearsonFam DIY Projects 7 05-25-2009 04:06 PM



FOLLOW US ON