Finally made some progress on this project....
My stint in grad school has become a real PITA this semester...
I've got 4 perlick 525s on the way so a tower is in the future.
Shot of the brackets I made to bolt the fridge to the foundation. They use the existing door bracket mounts.
I glued up a top made from cheapo 2x4's
Shot with the door open and some trim mocked up
I have some plans on how to mount the top, but I probably won't get a whole lot further until this semester ends and my work project wraps up...
The flash made the texture difference between the fridge and the collar look worse than it really is
