Kegconnection Complete Starter Kit and More Giveaway!


Home Brew Forums > Home Brewing Beer > DIY Projects > I am finally done with my RIMS

Reply
 
LinkBack Thread Tools
Old 11-24-2009, 02:08 AM   #1
ILOVEBEER
Feedback Score: 0 reviews
Recipes 
 
Join Date: Sep 2009
Location: CA
Posts: 728
Liked 5 Times on 5 Posts
Likes Given: 1

Default I am finally done with my RIMS

It has been months since I started. I added a bunch of things, since the original wet test drive reared several design flaw monsters I went back and welded steel tops and reinforced burner cages/supports. I added a water filter that I had laying around. I am ready to brew. Let me know what you guys think. Thanks to all that have helped me with this project.
Front View
Lid additions to all keggles. MLT loc line for sparge arm through top for heat retention while mashing
New top plates with heat shield to protect heat exchanger wires. The wires are wrapped in silicone hose in the tube
new sparge arm I made to replace original design
Control panel. QD for temp sensor on left side
40 plate heat exchanger. O2 setup with SS QD for easy removal of unit from heat exchanger

New mash paddle I made out of maple
Top view of burner plates. Below the 10" I had to make some reinforcements out of 1/2" x 2 flat stock. On my first test runm the flame was lapping up the keg. I added the 1/8" steel plates with 10" circles plasma cut out of them and fired it up...the steel was melting and I about cried. I added the supports between the original burner cage and the 1/8" steel and welded them up...fired it up and no more melting.

Two 6' sections of silicone 1/2" hose eah with a female SS QD are all I require for fluid transfer. Everything is SS or copper...no brass anywhere except for the two flared end caps. It took me a few months of seperate purchases but I managed to get rid of all brass.

This thing should give me years of trouble free service.

__________________

Last edited by ILOVEBEER; 11-24-2009 at 03:25 AM.
ILOVEBEER is offline
 
Reply With Quote Quick reply to this message
Old 11-24-2009, 02:54 AM   #2
samc
Feedback Score: 1 reviews
Recipes 
 
Join Date: Aug 2008
Location: Portland OR
Posts: 5,420
Liked 53 Times on 50 Posts
Likes Given: 29

Default

Nicely done, however you are never really done. Upgrades and changes will be your life!

__________________
samc is offline
 
Reply With Quote Quick reply to this message
Old 11-24-2009, 03:34 AM   #3
Dog House Brew
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
Dog House Brew's Avatar
Recipes 
 
Join Date: Jun 2008
Location: Indiana
Posts: 930
Liked 9 Times on 9 Posts
Likes Given: 2

Default

Awesome, where did you get your thermometers? I need a few for my build. RIMS is where I'm going. Changes that come to the "all I need is", yeh it will never be finished. Sure nice to get where you are though. Nice, very nice.

__________________

Are You Going to Drink all That?

Dog House Brew is offline
 
Reply With Quote Quick reply to this message
Old 11-24-2009, 05:20 AM   #4
ILOVEBEER
Feedback Score: 0 reviews
Recipes 
 
Join Date: Sep 2009
Location: CA
Posts: 728
Liked 5 Times on 5 Posts
Likes Given: 1

Default

I bought the mash tun 6" probe thermometer from morebeer.com I had the other 2 from before..they are 2" probes...although morebeer has those also.

Thank you for the compliments

__________________
ILOVEBEER is offline
 
Reply With Quote Quick reply to this message
Old 11-24-2009, 03:03 PM   #5
ibbones
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jun 2009
Location: Victoria, Texas
Posts: 527
Liked 2 Times on 2 Posts
Likes Given: 2

Default

I misread the title. I thought you were throwing in the towel and going back to a regular mash. I got scared and was going to ask why. You have a system that I am going to build in the next two to three years. Looks good.

__________________

"BONES"

Gun control is being able to hit your target.

ibbones is offline
 
Reply With Quote Quick reply to this message
Old 11-24-2009, 03:09 PM   #6
Blender
Feedback Score: 0 reviews
 
Blender's Avatar
Recipes 
 
Join Date: Jan 2006
Location: Santa Cruz, CA.
Posts: 3,116
Liked 5 Times on 4 Posts

Default

That looks like a very nice and well made setup. I wish I had the room for a rig like that.

__________________

Gary

Blender is offline
 
Reply With Quote Quick reply to this message
Old 11-24-2009, 03:22 PM   #7
ILOVEBEER
Feedback Score: 0 reviews
Recipes 
 
Join Date: Sep 2009
Location: CA
Posts: 728
Liked 5 Times on 5 Posts
Likes Given: 1

Default

Haha the funny thing is I have never brewed AG before EVER! I brew with a friend of mine who uses SABCO stuff. It is going to sound dumb...but Ihave read enough and watched enough videos and posted enough on blogs that I really think I can transition from extract to AG with minor glitches.

The wet test runs I have done (7) have allowed me to gain a little more confidence in the fluid transfers....knowing when the pump is primed....knowing what part of the frame get as hot as satan's a$$ to not touch.....use of the plate chiller etc.

I am brewing this week for certain. My MLT drains from the bottom, there is a 16g FB that covers the entire bottom of the keggle. Prior to allowing the fluid to feed into the heat exchanger I am going to vorlouf for a gallon or two until I have no particles and get clear wort. I dont want it to clog my sparge arm holes (very small). Does anyone do this with their RIMS setup?

__________________
ILOVEBEER is offline
 
Reply With Quote Quick reply to this message
Old 11-24-2009, 03:39 PM   #8
lehr
Feedback Score: 0 reviews
Recipes 
 
Join Date: Dec 2008
Location: flushing michigan
Posts: 805
Liked 16 Times on 16 Posts

Default

Ilovebeer, I did almost the same thing as you but when I built my system I had never brewed anything before. Have fun Pat.

__________________
lehr is offline
 
Reply With Quote Quick reply to this message
Old 11-24-2009, 03:46 PM   #9
ILOVEBEER
Feedback Score: 0 reviews
Recipes 
 
Join Date: Sep 2009
Location: CA
Posts: 728
Liked 5 Times on 5 Posts
Likes Given: 1

Default

Funny stuff....damn brother yours is almost too beautiful to even use......I thought mine was nice....mine is junk compared to yours...strong work!

__________________
ILOVEBEER is offline
 
Reply With Quote Quick reply to this message
Old 11-24-2009, 05:18 PM   #10
samc
Feedback Score: 1 reviews
Recipes 
 
Join Date: Aug 2008
Location: Portland OR
Posts: 5,420
Liked 53 Times on 50 Posts
Likes Given: 29

Default

Quote:
Originally Posted by ILOVEBEER View Post

I am brewing this week for certain. My MLT drains from the bottom, there is a 16g FB that covers the entire bottom of the keggle. Prior to allowing the fluid to feed into the heat exchanger I am going to vorlouf for a gallon or two until I have no particles and get clear wort. I dont want it to clog my sparge arm holes (very small). Does anyone do this with their RIMS setup?
I'd make bigger holes in the sparge arm - you really don't want to aerate the wort just in case HSA exists. I like to get my RIMS hot ASAP instead of pumping hot wort into a cold tube. I do have one piece of grain floating around in the arm but usually the holes let everything pass.
__________________
samc is offline
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
My RIMS job davebl DIY Projects 94 09-18-2011 09:26 PM
Why RIMS? Sea DIY Projects 9 11-16-2009 04:24 PM
RIMS set up! slnies DIY Projects 75 04-30-2009 12:10 PM
rtd rims polecreek DIY Projects 3 12-20-2008 06:46 AM
RIMS set ups ? slnies Equipment/Sanitation 41 01-18-2008 12:28 AM