I'm working on a Brutus clone that uses three Honeywell VR8200 gas controls. I'm trying to figure out the amount of power required for the 110VAC->24VAC transformer. Although it will probably never happen, I'd like to have a transformer big enough to run all three gas controllers at the same time. The manual for the VR8200 (found here) claims the following:
Hold-in current: 300mA max
Drop-out current: 250 to 90 mA
Thermostat heat anticipator setting: 0.5A.
Do I need to include the anticipator in overall current consumption, which would basically mean that each VR8200 uses 800mA? If so, then I'm looking for at least 2.4 amps of 24VAC. That would mean a transformer at least 60VA?
I'm pretty sure I know what the heat anticipator does (i.e. account for overshoot), but I don't know how it works, so I don't know how the 0.5A spec applies to the overall power consumption.
Thanks,
BB
|
|
|
05-16-2013, 04:07 AM
|
#2
|
|
Feedback Score: 0 reviews
Join Date: Aug 2007
Location: Yokosuka, Kanagawa Prefecture, Japan
Posts: 99
Liked 2 Times on 2 Posts Likes Given: 1
|
Humm... I have the same question, and found your post in my search. Did you ever get an answer, or decide on a solution?
__________________
Namako
Indecision... may or may not be my problem... I'm not sure
Primary 1 - BCS Munich Dunkel
Primary 2 - BCS Munich Dunkel
Kegged: BCS Maibock
Planned: BCS Doppelbock
Coming Soon: An upgraded Blichmann 20-gallon, Kal-inspired, BrewTroller-controlled, LP-heated HERMS pico-brewery (by Summer 2013, I swear!!)
|
|
|
05-16-2013, 09:49 AM
|
#3
|
|
Feedback Score: 0 reviews
Join Date: Feb 2013
Location: , Indiana
Posts: 92
Liked 7 Times on 6 Posts Likes Given: 5
|
__________________
Yellow Room brewery ~ why? Because the walls are yellow.
|
|
|
05-16-2013, 09:57 AM
|
#4
|
|
Feedback Score: 0 reviews
Join Date: Aug 2007
Location: Yokosuka, Kanagawa Prefecture, Japan
Posts: 99
Liked 2 Times on 2 Posts Likes Given: 1
|
I guess my question was more related to whether the heat anticipator setting (0.5A) actually needs to be considered in the calculations, and whether the draw is on whenever the gas valve is open.
__________________
Namako
Indecision... may or may not be my problem... I'm not sure
Primary 1 - BCS Munich Dunkel
Primary 2 - BCS Munich Dunkel
Kegged: BCS Maibock
Planned: BCS Doppelbock
Coming Soon: An upgraded Blichmann 20-gallon, Kal-inspired, BrewTroller-controlled, LP-heated HERMS pico-brewery (by Summer 2013, I swear!!)
|
|
|
05-16-2013, 01:11 PM
|
#5
|
|
Feedback Score: 0 reviews
Join Date: Jan 2010
Location: Western Fingerlakes NY
Posts: 134
Liked 11 Times on 10 Posts Likes Given: 2
|
Short answer, you need a transformer that can supply at least 300mA per valve at 24 VAC. (A higher amp rating is O.K., the valve will only use the amps it needs.)
Longer answer, the heat anticipator is a resistive heating circuit built into a thermostat. When a furnace is running, the current of the valve runs through the anticipator. The anticipator heats up the thermostat so that it kicks the furnace off before the room air is all the way up to the set point. This helps to prevent overshoot since the furnace blower will keep adding heat to the room, even after the burner is off, until the furnace has cooled to the fan off point.
The listed spec for the heat anticipator setting allows an installer to adjust the anticipator in the thermostat to an initial set point to match the current of the valve. The anticipator may then get further adjusted to eliminate overshoot or short cycle times.
In other words, the heat anticipator spec isn't an additional load in the valve, and isn't important to this application.
|
|
|
05-16-2013, 09:22 PM
|
#6
|
|
Feedback Score: 0 reviews
Join Date: Aug 2007
Location: Yokosuka, Kanagawa Prefecture, Japan
Posts: 99
Liked 2 Times on 2 Posts Likes Given: 1
|
Excellent answer!!! Thanks for that!!
If the 0.5A laod is not relevant to our applications, it would appear that most of the 24VAC transformers used in these applications would work to drive 2 or 3 gas valves.
I purchased the Honeywell AT72D transformer that puts out 40AV at 100% power, and I'm hoping it will drive two Honeywell VR8200A gas valves. Looks like it will work just fine, doesn't it?
__________________
Namako
Indecision... may or may not be my problem... I'm not sure
Primary 1 - BCS Munich Dunkel
Primary 2 - BCS Munich Dunkel
Kegged: BCS Maibock
Planned: BCS Doppelbock
Coming Soon: An upgraded Blichmann 20-gallon, Kal-inspired, BrewTroller-controlled, LP-heated HERMS pico-brewery (by Summer 2013, I swear!!)
|
|
|
05-17-2013, 12:48 PM
|
#7
|
|
Feedback Score: 0 reviews
Join Date: Dec 2010
Location: Springs, CO
Posts: 14
|
Agreed, nice answer, reynolds! That makes perfect sense.
I ended up not finding the answer to my question so I just bought one big enough to supply the additional 500mA.
For reference, here's the one I bought:
http://www.mpja.com/24V-4A-Center-Tapped-12-0-12-Transformer/productinfo/7845%20TR/
It was less expensive than many 40VA transformers I found. I've been using it for a year and half now and it's been doing it's job. It will drive three VR8200 controllers.
BB
|
|
|
05-17-2013, 12:54 PM
|
#8
|
|
Feedback Score: 0 reviews
Join Date: Dec 2010
Location: Springs, CO
Posts: 14
|
Yes, Namako, I would say the AT72D should work just fine. Looks like it's 24VA, which should be plenty to run 2 controllers. Looks like HD also has a Johnstone PF42440 40VA transformer for $12.59.
|
|
|
05-17-2013, 02:50 PM
|
#9
|
|
Senior Member
Feedback Score: 0 reviews
Join Date: Dec 2006
Location: Turner, Oregon, Oregon most of the time now
Posts: 2,220
Liked 27 Times on 26 Posts
|
For a single VR8200 you should use a 40Va transformer, lower Va transformers will open the valve but will heat up when running for more than a few minutes. For 2 valves a 75Va transformer would be appropriate for both valves operating at the same time.
What appliance builders install is meant for exposed air cooled operation and can be lower Va rated, when installed in a non ventilated control panel you need the higher Va rated transformer that is not as heavily loaded because of limited heat dissipation inside enclosure.
|
|
|
| Thread Tools |
|
|