Electric Brewing Supply 30A BCS Giveaway!


Home Brew Forums > Home Brewing Beer > DIY Projects > Finally finished my keezer
Reply
 
LinkBack Thread Tools
Old 05-19-2010, 01:53 AM   #1
Sol
Feedback Score: 0 reviews
Recipes 
 
Join Date: Nov 2009
Location: San Diego, CA, USA
Posts: 78
Default Finally finished my keezer

HBT! I've been away a long time, but I've been busy!

I just wanted to share pictures of my keezer that I could have never finished without help from the awesome people here. Not bad for a completely amateur woodworker if I dare say so myself. Even the pre-wife (who doesn't like beer) thinks it'll be a good addition to the bar. Now I just need some buddies to help me move it down stairs.

Special thanks to BrewPastor, Jester and all of the other keezer builders who came before me for the inspiration and guidance!





Mandatory first pint shot. A Pliny the Elder clone. Mmmmm...


Now time to get !!!

__________________
On tap (finally!): Stone Ruination knockoff
Bottled: Irish Red Ale
Keg priming: Raspberry Hefeweizen
Keg priming: Modified Ed Wort's apfelwein (half apple cider)
Primary: Modified Ed Wort's apfelwein (1/3 pomegranate)
On deck: Pliny the Elder clone
On deck: Bad Monkey Super Charged IPA

My keezer
Sol is offline
 
Reply With Quote Quick reply to this message
Old 05-19-2010, 02:01 AM   #2
KillerKellers
HBT_SUPPORTER.png
Feedback Score: 0 reviews
 
KillerKellers's Avatar
Recipes 
 
Join Date: Jun 2009
Location: Phoenix
Posts: 505
Liked 2 Times on 2 Posts
Likes Given: 1

Default

Nice job!!

__________________
My Keezer Build

Primary: 10g English Mild, 10g Robust Porter, 10g Skeeter Pee
Keg: Black Cherry Apfelwein, 10g AHS Low Carb Ale, 10g Centennial Blonde, Haus Pale Ale, Ginger Ale

Quote:
Originally Posted by carnevoodoo View Post
I find that a pint of my own semen makes the best starters.
KillerKellers is offline
 
Reply With Quote Quick reply to this message
Old 05-19-2010, 02:49 AM   #3
thedude00
Feedback Score: 0 reviews
Recipes 
 
Join Date: Apr 2010
Location: Staten Island, New York
Posts: 432
Liked 4 Times on 4 Posts
Likes Given: 2

Default

Great job it looks sweet.

__________________
Pour Standards a Staten Island, NY homebrew club
Pour Standards
thedude00 is offline
 
Reply With Quote Quick reply to this message
Old 05-19-2010, 03:17 AM   #4
johnny27
Feedback Score: 0 reviews
Recipes 
 
Join Date: Apr 2010
Location: california
Posts: 17
Default

Nice!! I really like the tile on the backsplash.

__________________
johnny27 is offline
 
Reply With Quote Quick reply to this message
Old 05-19-2010, 04:22 AM   #5
SweetSounds
Feedback Score: 1 reviews
Recipes 
 
Join Date: Jan 2010
Location: Des Moines, Iowa
Posts: 1,429
Liked 18 Times on 17 Posts
Likes Given: 4

Default

Beautiful!
Great job

Build pics?

__________________
Quote:
Originally Posted by Ecnerwal View Post
What does the primary pressure gauge on the tank tell us? That's right, the temperature. Put it on a scale if you want to know how much is in it...
Put some duct tape over the gauge - Or better yet - Replace the high pressure gauge with a plug - High pressure gauges are useless!
SweetSounds is offline
 
Reply With Quote Quick reply to this message
Old 05-19-2010, 03:23 PM   #6
Saerf
Feedback Score: 0 reviews
Recipes 
 
Join Date: Apr 2008
Posts: 5
Default

Nice job! That looks awesome.

__________________
Pappy Scheid Brewing Co.
Primary: Centennial Blonde
Conditioning: Edwort's IPA
On Deck: EwWort's Haus Pale Ale
Saerf is offline
 
Reply With Quote Quick reply to this message
Old 05-19-2010, 04:42 PM   #7
Sol
Feedback Score: 0 reviews
Recipes 
 
Join Date: Nov 2009
Location: San Diego, CA, USA
Posts: 78
Default

Thanks everybody!

Quote:
Originally Posted by SweetSounds View Post
Build pics?
I'm terrible at documenting builds. I actually had a lot of in-progress pics on my iPhone but loaded up the Beta of OS4, had problems, and lost a lot of them that weren't backed up.

Here's what I do have:

I started off with a simple frame around the freezer made from 2x4s on the bottom and 1x1s around the freezer itself. This allows enough airspace between the surface of the freezer and the wood to let air circulate so you don't burn out the compressor.




After that, I attached 1/2" plywood to the frame and bolted a 3/4" piece of plywood to the top that was roughly the shape of the counter top. I built the coffin box out of 1x1/2s and 1/2" ply.


I veneered the bottom with a maple veneer and got to work on the mahogany trim. This was by far the biggest pain in the ass of the project. The mahogany I got, while beautiful (these pics don't do it justice - it's absolutely gorgeous up close), wasn't cut square at all. As a result we had to come up with ways to get square pieces and spent many, many hours cutting it down. I also routed a shallow depression for the drip tray to sit in in the top of the plywood so it would be level with the tile.


The coffin box contains a PVC T that was built and insulated with insulation tape and copious amounts of electrical tape (the insulation tape didn't stick well). There are 4 holes in the freezer lid that are just big enough for the beer lines. They come up into the PVC and are then routed to the taps.


Like most, I used a Love temperature controller. I debated where to put it with my friend that was helping me with the build for a week. I wanted it in the side of the coffin box to make it accessible and give the keezer a high-tech feel. He said that would ruin the aesthetics of all the work we'd just done. Finally after getting several other opinions, I wound up agreeing and just velcroing it to the top of the hole in the back of the freezer where the compressor sits. I may still move it out to the side of the coffin box one of these days while he's not looking.

Overall the build took us about 3 months, but that makes it sound like much more work that it was. We both have very busy schedules and wound up only having Tuesday nights and a few weekend days here and there to spend on it. If it weren't for that mahogany being so expensive, total build cost would have been ~$800 - $900. I wound up spending about $400 over that on the wood.
__________________
On tap (finally!): Stone Ruination knockoff
Bottled: Irish Red Ale
Keg priming: Raspberry Hefeweizen
Keg priming: Modified Ed Wort's apfelwein (half apple cider)
Primary: Modified Ed Wort's apfelwein (1/3 pomegranate)
On deck: Pliny the Elder clone
On deck: Bad Monkey Super Charged IPA

My keezer
Sol is offline
 
Reply With Quote Quick reply to this message
Old 05-19-2010, 05:04 PM   #8
ubermick
Feedback Score: 0 reviews
Recipes 
 
Join Date: Jul 2009
Location: San Rafael, California
Posts: 989
Liked 22 Times on 21 Posts
Likes Given: 8

Default

Looks great, Sol - I'm jealous that yours is done!

I started mine about a month ago, and progress has been horrifically slow. The brewstand I built was slow, but a pleasure - this has just been a nightmare. I made a complete mess of the first counter, the first coffin I made looks great but it turned out to be an inch too low, and no matter how slow and precise I am at making sure my measurements are balls on (measure eight, cut once!), the trim around the outside of the lid won't match up to save it's life!

__________________
Hey look, a Brutus! | Hey look, a keezer! | Hey look, a milling station!
ubermick is offline
 
Reply With Quote Quick reply to this message
Old 05-19-2010, 05:32 PM   #9
brownsbrews
Feedback Score: 0 reviews
Recipes 
 
Join Date: May 2010
Location: warren, mi
Posts: 60
Liked 1 Times on 1 Posts

Default

Looks nice dude. I like the tile work looks realy clean. How long was the build?

Cheers
Ren and Julia

__________________

Cheers
Ren & Julia
Browns Brews Inc.
Primary - Air
Secondary
Bottled/Conditioning - Lemon Cream Ale

“Be who you are and say what you feel because those who mind don't matter and those who matter don't mind.”- Dr. Seuss

Check this site out
Brew Tips

brownsbrews is offline
 
Reply With Quote Quick reply to this message
Old 05-19-2010, 05:47 PM   #10
Sol
Feedback Score: 0 reviews
Recipes 
 
Join Date: Nov 2009
Location: San Diego, CA, USA
Posts: 78
Default

Quote:
Originally Posted by brownsbrews View Post
Looks nice dude. I like the tile work looks realy clean. How long was the build?
Thanks! Overall build time was 3 months, but work on it was very here-and-there. If I had to estimate the number of hours I'd put it right around 65. Keep in mind that I'm an amateur at best when it comes to working with wood. Somebody a little more handy would have finished this a lot quicker. It would have also shortened the build time if I had actually made plans ahead of time. Most of what you see is me saying "well, maybe we should do it this way".
__________________
On tap (finally!): Stone Ruination knockoff
Bottled: Irish Red Ale
Keg priming: Raspberry Hefeweizen
Keg priming: Modified Ed Wort's apfelwein (half apple cider)
Primary: Modified Ed Wort's apfelwein (1/3 pomegranate)
On deck: Pliny the Elder clone
On deck: Bad Monkey Super Charged IPA

My keezer
Sol is offline
 
Reply With Quote Quick reply to this message
Reply



Tags
keezer

Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Finally finished! Wade E DIY Projects 0 05-02-2010 10:36 PM
Finally Finished!! Now What to Brew Mirilis General Chit Chat 4 12-22-2009 01:42 PM
Finally finished by Keezer (Pics) ghart999 Bottling/Kegging 21 05-22-2008 04:15 PM
Finally finished!!! mullimat Bottling/Kegging 4 03-14-2008 05:34 PM
It's finally finished Monster Mash DIY Projects 13 03-26-2007 07:24 PM