I will be starting a build very soon. I thought I would post my plans and ask for opinions or tips.
I'm building a 25' cfc with 5/8" ID rubber garden hose and 3/8" OD refrigeration tubing and a 20-240 deg F probe.
The CFC will be semi-permanently mounted under my rolling brewing table. The water connections are shown opposite the wort connections but this may change. I intend to make water connections from the rear of the table but realize that I may need water flow control from the front. I was concerned about fluid being held in the chiller, so the lowest ports will be oriented low for drainage.
The CFC will be used in conjunction with a March MDXT-3 pump.
Camlock QDs will likely be used for the entire setup.
Any comments or tips are welcome. I want to build it right the first time.
Thanks