Kegconnection Complete Starter Kit and More Giveaway!


Home Brew Forums > Home Brewing Beer > DIY Projects > Another Keezer build - Sunbeam 7.2, 4 faucet tower

Reply
 
LinkBack Thread Tools
Old 01-23-2011, 07:59 PM   #1
SamuraiSquirrel
Feedback Score: 3 reviews
Recipes 
 
Join Date: Jun 2009
Location: Aurora, IL
Posts: 583
Liked 8 Times on 8 Posts

Default Another Keezer build - Sunbeam 7.2, 4 faucet tower

So, I just thought I'd go ahead and start a thread with pictures of my build since I received a lot of inspiration from the builds I have seen on the forum.

I'll just post updates as the project progresses. Everything has been ordered so it's just a matter of waiting for the shanks and rest of the supplies to arrive.

The freezer is a sunbeam 7.2 cu ft. chest freezer. I'm going for 4 taps with CO2 inside on the hump (it all fits with no collar). I am leaving the draft box big enough so that I can add a 5th and 6th tap if I ever desire (it would require building a collar).

So for some pics of the progress so far:

The draft box:




The tower dry fitted:




That's the progress so far. I just need to do some sanding and get it all stained. Then in a few days the shanks and everything else should be arriving to get it finished up.

More pics to come......

__________________
Up next: Kolsch, Alpha Squirrel, Tripel rebrew, Witbier

Currently Fermenting: Charlie Sheen (barleywine)

Kegged: Tiger Blood IPA, Irish Red, Strict Observance Tripel

Bottled: Dry Stout, Pliny the ..... Squirrel?, Cream Ale
SamuraiSquirrel is offline
 
Reply With Quote Quick reply to this message
Old 01-23-2011, 08:07 PM   #2
birvine
Feedback Score: 0 reviews
Recipes 
 
Join Date: Oct 2010
Location: Cochrane, Ontario, CANADA
Posts: 1,512
Liked 10 Times on 10 Posts
Likes Given: 4

Default

Just curious - which method are you using to cool the beer lines?

B

__________________
Manager & Head Brewer
Swan Lane Brewery
birvine is offline
 
Reply With Quote Quick reply to this message
Old 01-23-2011, 08:22 PM   #3
SamuraiSquirrel
Feedback Score: 3 reviews
Recipes 
 
Join Date: Jun 2009
Location: Aurora, IL
Posts: 583
Liked 8 Times on 8 Posts

Default

Well my plan was just to insulate the draft box and column. I'll add a small fan if foaming is an issue but I'd rather not. I have a friend who has a stainless tower on top of his freezer and foaming isn't too bad. My box isn't much taller so I woulde guess it would be similar. I am going to block off (with insulation) the dead tower space where the potential 5th and 6th taps would be. So the open space in the box above the column will only be an inch or two wider than the vertical column.

__________________
Up next: Kolsch, Alpha Squirrel, Tripel rebrew, Witbier

Currently Fermenting: Charlie Sheen (barleywine)

Kegged: Tiger Blood IPA, Irish Red, Strict Observance Tripel

Bottled: Dry Stout, Pliny the ..... Squirrel?, Cream Ale
SamuraiSquirrel is offline
 
Reply With Quote Quick reply to this message
Old 02-04-2011, 12:47 PM   #4
SamuraiSquirrel
Feedback Score: 3 reviews
Recipes 
 
Join Date: Jun 2009
Location: Aurora, IL
Posts: 583
Liked 8 Times on 8 Posts

Default

Progress













It turned out pretty much exactly as I pictured it before I started the build. I only wish that I had gone with 1X8 for the "depth" of the box rather than 1X6. It was a little tight by the time that I put the 3&1/8" shanks & elbow nipples in there. I probably could have gone with 2" shanks.

Anyways, it all fit pretty nicely actually just a little snug. Total invested in the wood tower is only about 50 bucks for pine, screws, dowels, glue, & stain.

The idea was to build a functioning and good looking tower while purchasing all the keggin hardware so that I could easily pimp it out completely "jester style" once I have a dedicated basement/beer room (this will be a couple years). I didn't want to have to rebuy anything once or if I decide to redesign the tower.

So i think it's mission accomplished ..........

Poured the first beer from it last night. Now I just need a drip tray and some tap handles.

__________________
Up next: Kolsch, Alpha Squirrel, Tripel rebrew, Witbier

Currently Fermenting: Charlie Sheen (barleywine)

Kegged: Tiger Blood IPA, Irish Red, Strict Observance Tripel

Bottled: Dry Stout, Pliny the ..... Squirrel?, Cream Ale
SamuraiSquirrel is offline
 
Reply With Quote Quick reply to this message
Old 02-06-2011, 08:32 PM   #5
SamuraiSquirrel
Feedback Score: 3 reviews
Recipes 
 
Join Date: Jun 2009
Location: Aurora, IL
Posts: 583
Liked 8 Times on 8 Posts

Default

Just wanted to post some comments in case anyone is considering a similar design.

I don't have any fan or cooling in the tower (other than the freezer below). I have been getting perfect pours even the first pour of the day out of the warm faucet. There is about 3/4-1" of head.

I don't really think that the insulation does much for me so I would recommend not going overboard with insulation or cooling. I'm using 3/16" I/D tubing. 5' lines. I have yet to see a reason to go with longer lines or stress about cooling the tower. There is only about a foot of uncooled beer line that goes up into the tower and it hasn't had ANY noticable negative effect on pouring or foaming.

__________________
Up next: Kolsch, Alpha Squirrel, Tripel rebrew, Witbier

Currently Fermenting: Charlie Sheen (barleywine)

Kegged: Tiger Blood IPA, Irish Red, Strict Observance Tripel

Bottled: Dry Stout, Pliny the ..... Squirrel?, Cream Ale
SamuraiSquirrel is offline
 
Reply With Quote Quick reply to this message
Old 02-17-2011, 01:16 AM   #6
SamuraiSquirrel
Feedback Score: 3 reviews
Recipes 
 
Join Date: Jun 2009
Location: Aurora, IL
Posts: 583
Liked 8 Times on 8 Posts

Default

Finally finished









__________________
Up next: Kolsch, Alpha Squirrel, Tripel rebrew, Witbier

Currently Fermenting: Charlie Sheen (barleywine)

Kegged: Tiger Blood IPA, Irish Red, Strict Observance Tripel

Bottled: Dry Stout, Pliny the ..... Squirrel?, Cream Ale
SamuraiSquirrel is offline
 
Reply With Quote Quick reply to this message
Old 02-17-2011, 01:19 AM   #7
ILOVEBEER
Feedback Score: 0 reviews
Recipes 
 
Join Date: Sep 2009
Location: CA
Posts: 728
Liked 5 Times on 5 Posts
Likes Given: 1

Default

Nice bro!

__________________
ILOVEBEER is offline
 
Reply With Quote Quick reply to this message
Old 02-17-2011, 03:35 AM   #8
ImperialLover
Senior Member
HBT_LIFETIMESUPPORTER.png
Feedback Score: 0 reviews
 
ImperialLover's Avatar
Recipes 
 
Join Date: Aug 2009
Location: Huntsville, AL
Posts: 536
Liked 28 Times on 25 Posts
Likes Given: 117

Default Awesome!

Nice build Brother! I'm sure you'll enjoy it!

__________________
-Chase

Keg 1- Air
Keg 2- Air
Primary 1- Rainy Day Red
Primary 2- Air
Secondary 1- Air
Secondary 2- Air
On Deck- H&D On the Brown Low
In The Hole- Water into Barleywine!
Near Future-
ImperialLover is offline
 
Reply With Quote Quick reply to this message
Old 02-17-2011, 06:21 AM   #9
dragonlor20
Feedback Score: 0 reviews
Recipes 
 
Join Date: Apr 2008
Location: San Diego, CA
Posts: 212
Liked 6 Times on 4 Posts

Default

"Finished" Nothing in this hobby ever seems to be finished!

That tower looks great, I really like your use of wood instead of flashy chrome! And your staining is very well done.

As a later project, I did a tower build when I first started with kegging, another thing that is relatively easy to do is build a countertop that covers the lid of your freezer



The staining was a lot of extra work, but I have been really happy with the results. Easier to do with a door on the front rather than the top, but conceptually, they should be similar...

__________________
dragonlor20 is offline
 
Reply With Quote Quick reply to this message
Old 02-17-2011, 11:58 PM   #10
SamuraiSquirrel
Feedback Score: 3 reviews
Recipes 
 
Join Date: Jun 2009
Location: Aurora, IL
Posts: 583
Liked 8 Times on 8 Posts

Default

Yeah I wanted to do something a little different and like I said above I wanted all the shanks and stuff so that if I decide to rebuild it I have all the necessary kegging hardware. I had a buddy who went the chrome tower route about a month ago and it looks good. I just felt the need to do something different. I really like how the stainless faucets look on the dark stained wood.

I agree that it's not finished lol. Finished for now is more what I meant. It will eventually go through a transformation. I don't know exactly know the details on phase two of the project or the transformation. It's food for thought at this point. Feel free to offer suggestions if anyone has any. It is put to rest for a little bit anyways until I decide to tackle the part that involves hiding the freezer.

__________________
Up next: Kolsch, Alpha Squirrel, Tripel rebrew, Witbier

Currently Fermenting: Charlie Sheen (barleywine)

Kegged: Tiger Blood IPA, Irish Red, Strict Observance Tripel

Bottled: Dry Stout, Pliny the ..... Squirrel?, Cream Ale
SamuraiSquirrel is offline
 
Reply With Quote Quick reply to this message
Reply


Quick Reply
Message:
Options
Thread Tools


Similar Threads
Thread Thread Starter Forum Replies Last Post
Jersh's Keezer build... Keezer thread #1,493,829 Jersh DIY Projects 40 05-22-2014 12:19 PM
4 Faucet PVC draft tower Brew-ta-sauraus DIY Projects 48 03-13-2014 08:59 PM
made some progress on my bar build/ keezer build 802VermontHomebrew DIY Projects 17 08-22-2010 01:20 PM
The keezer build is finally finished! Keezer porn attached. GRHunter DIY Projects 20 06-05-2010 03:38 AM
Adding a faucet to a two faucet tower. EricCSU DIY Projects 8 05-04-2010 06:34 PM